Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

LLBO Construction Industry Workforce Training Facility
New Construction
Conception
Duluth, Grand Rapids, Minneapolis, MN

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Open Air Structures and Accessory or Utility Buildings with Related Equipment and Services
Post-Bid

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

CDBG 2021 - Consolidated Pool
Results
MN

New Hope Public Works Facility Phase 1 Improvements
Renovation
Construction
Minneapolis, MN 55428

MN Valley ES Addition
New Construction, Renovation, Addition
Construction
$1,000,000 to $5,000,000 est. value
Minneapolis, MN 55437

Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Washburn Crosby A Mill Complex Ruins Preservation 2021
Renovation
Results
MN 55401

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

USPS IQ JOC Minnesota
Renovation
Results

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

C1dz--618-20-111, Renovate Bldg 223 for Pandemic Storage Design-Build
Renovation
Results
Minneapolis, MN

Reported 06/14/2022 03:18 PM
Project Title

Bde Maka Ska Pavilion - Minneapolis Park and Recreation Board

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55467   (Hennepin County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.minneapolisparks.org/news/2022/05/17/construction-on-new-bde-maka-ska-concessions-pavilion-area-begins-next-week/ Construction on a new concessions pavilion area at Bde Maka Ska begins next week! The project will create two new buildings, including new, all-gender accessible restrooms and ample outdoor public seating to replace the building that burned down in 2019. Work will start Monday, May 23 at the site of the former pavilion and continue throughout the year. The new buildings are scheduled to open next summer. Please stay away from construction areas and follow all detour signs. Construction Impacts Boating The Bde Maka Ska boat launch will be closed June 6-September 16. Trailered boats will not be allowed on or off the lake while the boat launch is closed. Boat launch hours are 6 am-10 pm through May 30, then 2-8 pm May 31-June 5. The Minneapolis Sailing Center and Wheel Fun Rentals will continue to operate at northeast Bde Maka Ska this season. Trail and Road Closures Occasional trail closures will be necessary to maintain a safe work area. Road closures may also be necessary. Please visit the Bde Maka Ska Refectory Rebuild project page and subscribe to email updates to stay up-to-date on trail or road closures related to this project. Background The former Bde Maka Ska concessions pavilion, also called a “refectory,” was built in 1930 and was operated seasonally until it burned down in 2019. The site was paved over to provide a temporary gathering space at the popular northeastern corner of the lake and utilities were repaired to allow vendors to continue operating. The Bde Maka Ska-Harriet Master Plan, approved in 2017, provided guidance for the pavilion site improvements. The new pavilion concept was designed by a team led by Cuningham after working with Minneapolis Park and Recreation Board staff and numerous stakeholders. MPRB Commissioners approved the project’s concept design in May 2021 and a construction contract was awarded in May 2022. ____________________________________________________________ As of April 2, 2021, this project is in the design phase. Design firm information has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September 2022. Proposed new Bde Maka Ska pavilion The Minneapolis Park and Recreation Board has two options in mind for a new Bde Maka Ska pavilion to replace the one that burned down in 2019, destroying the Lola on the Lake restaurant. Both concepts propose dividing the pavilion site into two buildings and providing a performance area. Concept A shows more trees integrated into the seating areas. It would have a dining space in the northern building with relatively equal amounts of space for food service, restrooms and storage in the southern building. Concept B features a large central gathering space. It would have a dining space in the southern building, larger restrooms and less space for food service and storage than Concept A. Cost estimates will be presented to the Park Board after a site concept is chosen.

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents