Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

Towns at Union PUD
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Westfield, IN 46074

Hyde Park Towns and Flats
New Construction, Infrastructure
Design
$140,000,000 CJ est. value
Noblesville, IN 46060

Sheldon Street Improvements
Infrastructure
Bidding
$142,000 CJ est. value
Warsaw, IN 46580

SR 29 Water Main Replacement Project
Infrastructure
Bidding
$800,000 CJ est. value
Logansport, IN 46947

Town of Avon Ce for Dan Jones Road, Phases I & II
Infrastructure
Post-Bid
$10,600,000 CJ est. value
Avon, IN 46123

Road Reconstruction
Infrastructure
Post-Bid
$2,941,000 CJ est. value
Huntertown, IN 46818

Pocket Park Improvements
Renovation
Results
$250,000 to $500,000 est. value
Whiting, IN 46394

Kephart Park
New Construction
Results
$3,000,000 est. value
Bargersville, IN 46106

Hobbs Station Mixed Use
New Construction, Infrastructure - 270,000 SF
Construction
$300,000,000 CJ est. value
Plainfield, IN 46168

Westfield-Washington Public Library
New Construction, Infrastructure - 54,000 SF
Construction
$16,700,000 CJ est. value
Westfield, IN 46074

Remington Subdivision
New Construction, Infrastructure
Pending Verification
$465,500,000 CJ est. value
Fishers, IN 46038

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

Bridge Thin Deck Overlay - SR 101
Infrastructure
Conception
$549,826 CJ est. value
Woodburn, IN 46797

Last Updated 10/16/2023 04:39 PM
Project Title

Track Resurfacing : Rushville Consolidated High School

Physical Address View project details and contacts
City, State (County) Rushville, IN 46173   (Rush County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A unified bid is requested for all work in this project. All responses received shall be in full accordance with the instructions set forth in the Invitation for Bid. The school reserves the right waive any irregularities or technicalities.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents