Similar Projects
Construction Management Services; Project Elevate
Results
Grand Rapids, MI

Construction of a New Administration Facility and Security, Communications and Electrical Infrastructure Relocation and Upgrades
New Construction
Results
Ypsilanti, MI

Airfield Construction Project at the Detroit Metropolitan Wayne County and Willow Run Airports
Post-Bid
Ypsilanti, MI 48198

Terminal Building Improvements - Phase IV at the Mackinac Island Airport
Results
Less than $79,552 est. value
Mackinaw City, MI

Construction Management Services
Results
Less than $296,141,000 est. value
Grand Rapids, MI 49512

New Terminal Building at the Alpena County Regional Airport
New Construction - 13,000 SF
Construction
$11,600,000 est. value
Alpena, MI 49707

Airport Terminal Building at Brooks Field
Results
Marshall, MI

Last Updated 03/04/2020 01:50 AM
Project Title

Passenger Boarding Bridge Supply and Installation

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI   (Kent County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete Construction Phase Services Including Relocation of existing Bridges and Installation of New Bridges The GFIAA issues this Request for Qualifications (RFQ) in its process to obtain PBB Contractor services for the supply and installation of eight new PBBs and the relocation of four existing PBBs. A. Design phase services may include the following: • Work with GFIAA and the design/construction team as a partner in developing solutions for Project Elevate • Provide detailed cost estimating and knowledge of marketplace conditions • Provide project planning and scheduling related to PBBs • Develop PBB construction phasing and scheduling that will minimize interruption to airport operations • Advise GFIAA on ways to gain efficiencies in project delivery • Participate with GFIAA in a process to set goals for DBE participation and implement the DBE program • Protect the Owner’s sensitivity to quality, safety, and environmental factors • Completion and submission of submittal packages for Owner and Architect review and approval B. Construction phase services may include the following: • Arrange for procurement of materials and equipment • Schedule and manage site operations • Provide quality controls • Bond and insure the PBB construction • Address all federal, state and local permitting requirements • Assist with resolving Owner issues and challenges • Coordination with Owner-performed oversight and the Concourse A Expansion Construction Manager • Document control for all communications, documents, submittals, etc. • Relocation of existing PBBs • Installation of new PBBs

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts