Similar Projects
Ellisville Wastewater Plant Expansion
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Valrico Treatment Plant Structural Rehabilitation Project
Renovation
Bidding
$391,236 est. value
Dover, FL 33527

Lime Softening Water Treatment Plant SCADA PLC Hardware Modifications and Filter Control Upgrades
Bidding
$175,000 est. value
Bartow, FL 33830

Privatization of the Wastewater Collection System at U.S. Navy Station Mayport, FL
Post-Bid
Jacksonville, Mayport, FL 32233

Towns Water Treatment Facility (WTF)
Post-Bid
Greenville, FL 32331

General Electrical Design - Substations 9, 10, 11, and 12
Results
Less than $6,430,280 est. value
Miami, FL 33010

Sumterville Water Plant Improvements
Results
Less than $400,000 est. value
Bushnell, Sumterville, FL 33585

RWRF Phase I Plant Improvements
Construction
Less than $6,700,000 est. value
Altamonte Springs, FL

Hodge Street Water Production Facility Upgrades
Construction
$1,970,000 to $2,436,210 est. value
Satsuma, FL 32189

Meadowlake Water Treatment Plant Expansion
Design
Less than $1,686,000 est. value
FL

Water Treatment Plant Refurbishment (Access Platforms, Pipe Supports, Grating and Coating)
Renovation
Bidding
Cape Coral, FL

Replacement of 48in Butterfly Valve and Actuator on Hydrotreaters
Post-Bid
Less than $484,000 est. value
Miami, FL 33173

Doug Allen WRF SBR Improvements
Results
$10,000,000 to $15,000,000 est. value
Bartow, FL 3831

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD
Addition
Construction
Jacksonville, FL 32256

Last Updated 03/25/2021 11:18 AM
Project Title

Mourning Dove WTP - Solids Train Upgrade

Physical Address View project details and contacts
City, State (County) Titusville, FL 32796   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Experienced, qualified, and licensed Contractor to perform upgrades to the Mourning Dove WTP solids treatment train and other related work consisting of: construction, demolition, and renovation. Contractor will also be responsible for maintaining plant flow and treatment processes in addition to removal and/or relocate equipmen

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents