Similar Projects
Exhaust Hood Cleaning Services - District Wide
Results
Taylors, SC

Partial HVAC Replacement at Blue Ridge Middle School
Results
Greer, SC 29651

Coolers/Freezers for Three Schools
Post-Bid
Fort Mill, SC 29715

HVAC Water Chiller Maintenance
Term Contract
Results
Taylors, SC 29687

HVAC Maintenance
Results
Aiken, Anderson, Barnwell, Beaufort, Bennettsville, Chester, Columbia, Conway, Florence, Greenville, Kingstree, Lancaster, Marion, Orangeburg, Pee Dee, Sumter, SC

Mechanical Design-Build Services - HVAC Project - Berea Middle
Post-Bid
Greenville, SC 29617

HVAC and Mechanical Products
Term Contract
Bidding

Greenville - Building 112 Chiller Addition
Post-Bid
$280,000 to $330,000 est. value
Greenville, SC 29607

SFMS HVAC Project
Results
Less than $1,699,881 est. value
Fort Mill, SC 29715

Partial HVAC Replacement Project at Greer High School
Results
Greer, SC 29651

HVAC Maintenance Platforms - Three Schools
Results
Greenville, Simpsonville, SC 29615

Heating, Ventilation, and Air Conditioning (HVAC) Project for East North Street Academy
Post-Bid
Greenville, SC 29607

Covid-19 HVAC Equipment Servicing
Post-Bid
Fort Mill, SC

SCDMH Piedmont and Greer HVAC Maintenance
Term Contract
Bidding
Simpsonville, SC 29681

HVAC and Mechanical Products and Solutions
Term Contract
Bidding

Last Updated 05/19/2021 04:38 PM
Project Title

Installation of Pipe and Duct Insulation

Physical Address View project details and contacts
City, State (County) Taylors, SC   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide installation of pipe and duct insulation services on an asneeded basis, at mutiple locations throughout the District. This work may include any and/or all of the following depending on project requirements: 1. Site investigation to determine detailed scope of work, documentation of scope (written description, drawings, digital pictures, estimate/material take-off, etc.). 2. Submission of cost, schedule, submittals, samples, and other required items for review. 3. Execution of Contract for the work in accordance with this solicitation and GCS Terms and Conditions. 4. Project Kick-Off meeting with all stakeholders and continued project communications through-out the work. 5. Demolition and disposal of existing insulation. 6. Cleaning and surface preparation of surface to be insulated. 7. Supply and install of new insulation system. 8. Jobsite clean-up. 9. Final Execution Report of all work. 10. Other assignment as may be related to the scope.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents