Similar Projects
SR 4010 ov Larry's Creek
Infrastructure, Renovation
Conception
$1,205,000 CJ est. value
Trout Run, PA 17771

SR 4010 ov Larry's Creek
Infrastructure, Renovation
Conception
$1,205,000 CJ est. value
Trout Run, PA 17771

PA 44 over Ramsey Run
Renovation
Design
Jersey Shore, PA 17723

SR 405 over Glade Run
Demolition, New Construction, Infrastructure
Design
$1,260,000 CJ est. value
Montgomery, PA 17752

Sealcoat
Infrastructure
Post-Bid
Williamsport, PA

Resurfacing/Paving
Infrastructure
Post-Bid
Williamsport, PA

Structure Replacement - Bridge No 12-9002
New Construction, Infrastructure
Results
$500,000 to $1,000,000 est. value
PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Old City Mixed Use Development Phase I
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Williamsport, PA 17701

Old City Mixed Use Development Phase I
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Williamsport, PA 17701

SR 3010 ov Larrys Creek
Infrastructure, Renovation
Conception
$1,875,000 CJ est. value
Jersey Shore, PA 17740

PA 973 over North Fork Tombs Run
Infrastructure
Design
$550,000 CJ est. value
Anthony Township, PA 17740

2022 Pavement Restoration
Infrastructure
Post-Bid
Williamsport, PA

SR 405 d SR 2014 Intersection
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
Muncy, PA

SR 1006 over Slacks Run
Infrastructure, Renovation
Conception
$715,000 CJ est. value
Trout Run, PA 17771

Last Updated 04/07/2023 05:10 AM
Project Title

PA 284 over Blacks Creek

Physical Address View project details and contacts
City, State (County) Cummings Township, PA 17776   (Lycoming County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $1,737,818 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 284 over Blacks Creek, Pine Township. Primary Improvement Type: Bridge Replacement As of April 07, 2023, the project is In development stage. Anticipated letting date is October 10, 2024. PennDOT - PA 284 over Blacks Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents