Similar Projects
Bellview, Brown Barge and Warrington Middle Schools Exterior Coatings Project
Alteration
Bidding
$325,500 est. value
Pensacola, FL

Hurricane Sally Repairs - Roof and Interior Repairs at Escambia County Sheriff's Office Storage Building
Alteration
Bidding
$300,000 est. value
Pensacola, FL 32501

Perdido Landfill Scale House Awning Replacement
Post-Bid
Pensacola, FL

Stucco Repairs Pensacola Beach Toll Plaza
Post-Bid
FL

MC Blanchard Main Entrance Modifications
Results
FL

Repair and Replacement of Window Coverings
Term Contract, Alteration
Results
FL

NB Cook Elementary School Building Envelope Repair
Construction
Pensacola, FL 32503

Perdido Landfill Aluminum Walkway Replacement
Post-Bid
FL

Hurricane Sally Repairs - Group 2 (Pensacola Beach)
Alteration
Results
$108,000 est. value
Pensacola Beach, FL 32561

TTO Traffic Department
Post-Bid
FL

Hurricane Sally Repairs Group 2, Lot 1 - Pensacola Beach Public Safety Main Building
Alteration
Results
Pensacola Beach, FL 32561

Airport Terminal Flooring Replacement Project Phase I
Post-Bid
Pensacola, FL 32504

Hurricane Sally Repairs - ECAT Fuel Island
Renovation, Alteration - 2,419 SF
Results
Pensacola, FL 32501

Mobile Pit Deck Project
Alteration
Post-Bid
Pensacola, FL 32500

ECAT Main Public Lobby Area
Renovation
Post-Bid
Pensacola, FL

Reported 05/18/2022 12:00 AM
Project Title

Hurricane Sally Repairs for Road Prison Uniform Storage Building

Physical Address View project details and contacts
City, State (County) Cantonment, FL 32533   (Escambia County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior, Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior: 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply. 2. Remove one (1) aluminum framed, double hung window with screen on the Southwest corner of the structure. 3. Following the removal of the window, the rough in bucks should be removed and replaced with like kind and quality components (assumed lumber). A self-adhered membrane should then be applied to the head, sill, and jambs of the rough in for additional moisture deterrence. 4. The new replacement window (contractor to verify dimensions) should be installed per manufacturer recommendations and be of like kind and quality. Wall and Ceiling Paneling: 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply. 2. Remove all light fixtures, heat/AC registers, and other buildings off from the walls and ceilings. In the restroom, the wall mounted sink, the plate glass mirror, handicap grab bar, toilet paper dispenser, soap/hand sanitizer, and paper towel dispenser will have to be removed in order to remove the wall paneling in this room. 3. Remove the faux wood paneling and fiberglass reinforced plastic from the walls throughout the structure (2,100 SF of wood paneling and 250 SF of fiberglass reinforced plastic just in the restroom). 4. Remove the gypsum wallboard on the ceilings and the walls of the restroom (approximately 850 SF overall; 600 SF on the ceilings of the offices and storage area and 250 SF of the ceiling and walls of the restroom). 5. Remove and replace 3000 SF of R-30 batt insulation found inside the walls and ceilings per manufacturer recommendations. Ensure newly installed batt insulation matches previously removed insulation in R-value and type. 6. Install new 3/8” gypsum wallboard on the ceilings and on all the walls of the restroom. Gypsum wallboard should be taped and floated. 7. Install new wall paneling on the walls throughout the building including the 250 SF of fiberglass reinforced plastic on the walls and ceiling of the restroom - trim included. 8. Apply acoustic ceiling (popcorn) texture to the ceilings where previously done avoiding overspray onto the walls. Paint all door/window trim and jambs and door slabs. Prime door slabs as needed. All painting should be done with a minimum of two (2) coats of paint to ensure proper coverage. 9. Once all new wall paneling has been installed, reinstall the previously removed building components that include all light fixtures, heat/AC registers, wall mounted sink, plate glass mirror, handicap grab bar, toilet paper dispenser, soap/hand sanitizer, and paper towel dispenser per manufacturer recommendations. VCT Flooring: 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply. 2. Remove the moisture damaged VCT located in every room cautiously in an attempt to prevent damage to the lumber substrate (approximately 600 square feet). Contractor will need to remove the toilet in the restroom in order to completely remove the affected VCT in that area. 3. Any moisture damaged lumber substrate or lumber substrate damaged during VCT removal should be removed and replaced with like kind and quality material. Contactor should include a unit price for lumber. 4. Lumber substrate shall then be properly prepped and cleaned to ensure proper adhesion to new VCT. 5. New VCT should then be installed per manufacturer recommendations. 6. After VCT has properly adhered to the lumber substrate, the toilet previously removed from the restroom should be reinstalled per manufacturer recommendations. Window Blinds: 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply. 2. Remove and replace eight (8) 1” PVC window blinds in the windows along the southern side of the structure. New windows blinds should match existing as best possible.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 08 - Openings, Windows.
Division 09 - Finishes, Ceilings, Flooring, Interior Wall Paneling.
Division 12 - Furnishings, Window Blinds.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents