Similar Projects
Quick Set Flowable Fill & Concrete Delivery
Alteration
Results
San Antonio, TX 78275

2023 Street Rehabilitation TOC PKG 3
Infrastructure
Results
$9,684,543 CJ est. value
San Antonio, TX 78205

West Apron Taxilane Reconstruction
Infrastructure
Results
$2,653,974 CJ est. value
San Antonio, TX 78216

2022 Street Maintenance Program
Infrastructure
Results
$910,801 CJ est. value
Alamo Heights, TX 78209

2019 Street Maintenance Program
Infrastructure
Post-Bid
$893,930 CJ est. value
Sandy Oaks, TX 78112

Spigel (Guilbeau Rd) Trailhead (French Creek)
Infrastructure
Results
$489,000 CJ est. value
San Antonio, TX 78205

Thomas Jefferson High School Renovation & Restoration
Renovation - 14,100 SF
Post-Bid
$3,856,528 CJ est. value
San Antonio, TX 78201

Stinson 9/27 Sealant and Threshold Failure Repair
Infrastructure
Results
$1,426,651 CJ est. value
San Antonio, TX 78214

RFP Construction Manager-At-Risk - ECISD 2022 Bond - New Schools, Additions and Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$150,000,000 CJ est. value
San Antonio, TX 78205

Labor and Materials for Asphalt in Park Operations
Term Contract
Post-Bid
$1,500,000 CJ est. value
San Antonio, TX 78205

Labor and Materials for Asphalt in Park Operations
Infrastructure
Results
$4,075,470 CJ est. value
San Antonio, TX 78237

Red Horse Park Package 2
Infrastructure
Results
$252,598 CJ est. value
Universal City, TX 78148

HVAC Control System Repairs & Maintenance
Term Contract
Post-Bid
San Antonio, TX 78205

For Construction Of The Section 45, Reserve F Park Improvements Fort Bend County Municipal Utility District No. 134b
Infrastructure
Results
$110,875 CJ est. value
Fort Sam Houston, TX 78234

Woodcrest Trail Project
Infrastructure
Results
$262,000 CJ est. value
Live Oak, TX 78233

Last Updated 06/23/2023 02:04 PM
Project Title

San Antonio Airport Terminal A Electrical System Expansion

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78216   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $11,930,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of construction work at San Antonio International Airport, San Antonio, Texas. The intent of the contract is to provide for construction and completion of the work described. It is further intended that the Contractor furnish all labor, materials, equipment, tools, transportation and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. The description of the base bid and alternate scope of work is as follows: BASE BID The base bid consists of construction documents composed of Volume I and Volume II with Project Manual. Volume I: Terminal A Electrical System Expansion Commissary Space, IDF Room and Expanded Dock - Volume I consists of Phase 1, 2 and 3. It is a building renovation to SAT Airports service level with modifications to Electrical Room, overhead sanitary & fire lines, Commissary Space and extended service Dock including new walk-in coolers & freezers. The dock expansion will require pavement demolition and new built-up concrete dock. The renovation scope includes selective demolition of CMU walls and concrete pavement, new interior finishes include paint, new mechanical, electrical, plumbing, fire suppression, communication, data and security systems. emporary barricades will be required with clear access maintained at dock and ramp to dock at all phases. Volume II: Terminal A Electrical System Expansion incorporates the installation of two new 4,000 amp main switchgear sections with generator and fire pump compartments allowing room to expand for future projects as well as replacement of the existing CPS Energy utility transformers. It consists of multiple electrical system shutdowns, an expanded electrical room, switchgear replacement, motor generators relocation with electrical related modifications and grounding upgrades throughout Terminal A. Two temporary generators (on flatbed trailer) will be placed at Taxi queuing lane adjacent to service level entry. Temporary generators shall be protected by concrete Jersey barriers with chain-link fence and poly mesh screen along taxi que lane. The shutdowns and changeovers will all have to be coordinated with Airport Aviation and done after hours with limited time for shutdowns. A complete comprehensive plan for shutdowns, changeovers, and tie in connections will be required and vetted with Airport Aviation prior to any work performed. This work also includes mobilization, insurance and bonds, Airport safety and security, storm water pollution prevention, site preparation, unclassified excavation, construction surveying, staking and layout, all existing utility locating, protection of all existing utilities and facilities, and Contractor's quality control. The Deadline for questions is scheduled for May 24, 2023, at 4:00 PM (CT).

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents