Similar Projects
Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

City of Plymouth Const / Misc-Sidewalk Improv NMTPP
Infrastructure
Design
$2,000,000 CJ est. value
Plymouth, WI 53073

Dust Collector Replacement
Renovation
Bidding
$502,000 CJ est. value
Plymouth, WI 53073

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Road Projects
Infrastructure
Post-Bid
$123,000 est. value
Kiel, WI 53042

Indian Mound Road
Infrastructure
Results
$391,950 est. value
Sheboygan, WI 53081

2022 Street Repairs
Infrastructure
Results
$270,000 est. value
Sheboygan Falls, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Indiana Avenue - Streetscape Improvements - Phase Two of Two
Infrastructure
Conception
$750,000 CJ est. value
Sheboygan, WI 53081

Kewaskum-Waldo RR Xing Signals
Infrastructure
Design
$500,000 CJ est. value
Waldo, WI 53093

Last Updated 08/28/2023 02:16 PM
Project Title

Unit 15 Walkway Replacement

Physical Address View project details and contacts
City, State (County) Plymouth, WI 53073   (Sheboygan County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Prison/Jail, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $139,854 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of approximately 530 LF of walkway near Unit 15 along with associated grading to reduce slope of walkway. The existing walkway is concrete and the proposed walkway is asphalt

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents