Similar Projects
The Gardens at Somerset Subdivision
New Construction - 273,600 SF
Conception
$10,000,000 CJ est. value
Westfield, IN

Liberty Estates Mixed Use
New Construction
Conception
$120,000,000 est. value
Merrillville, IN 46410

North East Park Loop Trail
New Construction
Bidding
$80,000 est. value
Greenwood, IN

Reverend Charles Williams Park
Renovation
Bidding
$1,000,000 to $2,000,000 est. value
Indianapolis, IN 46205

New Tennis Courts for YCS
Post-Bid
Less than $800,000 est. value
Yorktown, IN 47396

Purchase of Playground Equipment and Rubber Surfacing at Winslow Woods Park
Post-Bid
Bloomington, IN 47401

2021 Tennis Court Rehabilitation
Results
Fort Wayne, IN 46814

New Haven Community Center Park Improvements
Results
New Haven, IN 46774

The Ellsworth Mixed Use
New Construction - 33,280 SF
Construction
$17,700,000 est. value
Lafayette, IN 47901

Blue Road Apartments
New Construction
Construction
$40,000,000 est. value
Greenfield, IN 46140

Oxford Drive Apartment Complex
New Construction
Pending Verification
Zionsville, IN 46077

Summerton Subdivision
New Construction
Pending Verification
McCordsville, IN

Kingsbridge Mixed-Use Development
New Construction
Conception
Franklin, IN 46131

Park Improvement
Post-Bid
New Whiteland, IN

2021 Warsaw High School Tennis Courts
Results
Warsaw, IN 46580

Last Updated 06/15/2022 01:02 AM
Project Title

Scattered Sites Playground Replacements

Physical Address View project details and contacts
City, State (County) Elkhart, IN   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall be performed as per Plans and Specifications prepared by Forum Architects, LLC, 415 Lincolnway East, Mishawaka, Indiana, and Bids are desired for Scattered Sites Playground Replacements (ProjectIN0264-22-3), in Elkhart, Indiana 2. Work includes the removal of existing playground equipment and installation of new playground equipment. Additional work includes removal of existing pea grave, topsoil, subsoil and concrete apron as required for installation of new perimeter curbing, access sidewalk and new playground surfacing for playground area. Proposals shall be properly and completely executed on the forms provided in the Specifications.4. All Bids must be accompanied by a signed copy of the "Statement of Bidder's Qualifications/Affirmative Action in the form set forth in the Specifications. All prime Contractors submitting Bids on the Project shall encourage qualified minority subcontractors to perform any portion of the Work in the Project which is not performed by the Contractor's own forces. All bidders shall comply with HUD Section 3 Clause of regulation 24 C.F.R. part 135, with preference given to Certified Section 3 Bidders as outlined in the Project Specifications.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents