Similar Projects
Pavement Preservation North Dakota
Term Contract
Design
$5,000,000 to $7,000,000 est. value
Buford, Dickinson, ND

Water, Sewer, Storm Sewer, and Street Improvements
Infrastructure
Bidding
Williston, ND

Water, Sewer, Storm Sewer, and Street Improvements
Infrastructure
Bidding
Williston, ND

9th Avenue Roadway
Infrastructure
Post-Bid
Williston, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

South Main Street Reconstruction Sanitary Sewer, Water Main, Storm Sewer, and Street Improvements
Results
$1,130,000 to $2,520,000 est. value
Tioga, ND

US 2, near JCT ND 40 (Tioga) E to Stanley - EB and ND 8, 6th AVE SW N to1st Ave SW (Stanley ) - Chip Seal
Infrastructure
Bidding
$100,000 to $1,500,000 est. value

60th Street Reconstruction
Results
$750,000 to $1,000,000 est. value
Williston, ND

2022 Street Improvements Ray
Infrastructure
Bidding
$931,000 est. value
Ray, ND

Farris Subdivision - 50th Drive Northwest
Infrastructure
Results
$190,000 to $210,000 est. value
Williston, ND 58801

Mill and Overlay, Guardrail, ADA Ramps, Adjust Utility Appurtenance
Infrastructure
Results
ND

Mill and Overlay
Infrastructure
Results
$3,500,001 to $4,000,000 est. value
ND

2022 Seal Coat Patching
Infrastructure
Results
Williston, ND

2022 Seal Coat
Infrastructure
Results
Williston, ND

Northeast Tioga Reconstruction - Phase II
Infrastructure
Results
$3,700,000 est. value
Tioga, ND

Reported 03/31/2022 12:00 AM
Project Title

Hawkeye Village Phase II Improvements

Physical Address View project details and contacts
City, State (County) Williston, ND   (Williams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of municipal underground utility improvements (sanitary sewer, watermain, storm sewer & associated service connections), temporary erosion control, permanent erosion control, clearing & grubbing, mass grading, fine grading, aggregate base course, hot-mix bituminous pavement, curb & gutter, sidewalk & driveway pavement, and street lighting. intersection of 11th Street West and 32nd Avenue West, travel north from the roundabout 0.15 miles to Bison Drive. Due west on Bison Drive 0.25 miles to 36th Avenue West. Due north approximately 0.10 miles to the beginning of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents