Similar Projects
Construction of Milton Fire Station 42
New Construction, Infrastructure
Bidding
Milton, GA 30004

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Stadium Red Lot Bus Only Lane
Post-Bid
Atlanta, GA 30315

T-0033-7 CDBG Roswell Road Streetscape
Results
Sandy Springs, GA

Pedestrian Improvements on Various City Roads
Results
Fairburn, GA 30213

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Town Center Xpress Park and Ride Lot Construction
Results
Atlanta, GA 30303

Construction of Washington Road Sidewalks
Results
Less than $66,182 est. value
East Point, GA 30344

Findley Plaza Revitalization Project and Inman Park Intersection Improvements
Results
Atlanta, GA 30303

Dodd Street Pedestrian Improvements Project
Results
Fairburn, GA 30213

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase B
Results
GA

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase C
Results
GA

Bohannon Road Sidewalk Project
Results
Fairburn, GA 30213

Sidewalk Improvements
Results
Less than $89,807 est. value
Hapeville, GA 30354

Last Updated 08/03/2021 09:26 AM
Project Title

Contract for EP-183 Ben Hill (South) Rd. Sidewalks

Physical Address View project details and contacts
City, State (County) East Point, GA 30364   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for this project consists of constructing continuous sidewalk along Ben Hill Rd. that will tie into the north and south ends of the newly constructed sidewalk along 4235 Ben Hill Rd.(Duke Realty Property). Construction services will include a 6’ sidewalk, 30” curb and gutter with a 2’ grass strip, and concrete sidewalk spillways and handrails. All existing ramps shall be upgraded in compliance to ADA standards. In addition, pedestrian crossing signs are to be installed at the proposed mid-block crossing of Ben Hill Rd. @ Heritage Park Blvd.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents