Similar Projects
Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Design
$1,000,000 to $5,000,000 est. value
FL

Drainage
Bidding
Less than $250,000 est. value
FL

Drainage Improvements
Bidding
Less than $200,000 est. value
FL

Historic Miramar Drainage System Improvements Phase V
Post-Bid
$400,000 to $550,000 est. value
Miramar, FL 33025

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Historic Miramar Drainage System Improvements, Phase IV
Results
Miramar, FL

Flood Control and Coastal Emergency Beach Erosion Control Project Broward County, Florida - Broward County Segment III
Results
$5,000,000 to $10,000,000 est. value
Dania, Hallandale, Hollywood, FL

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Bidding
Less than $27,583,008 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Post-Bid
$25,000,000 to $35,000,000 est. value
FL

SBDD Stormwater Culvert Slip-Lining Project
Results
Southwest Ranches, FL

Segment II Nearshore Hardbottom Mitigation
Results
Less than $6,075,000 est. value
FL

Recreational Artificial Reef Project
Results
Less than $234,625 est. value
Deerfield Beach, FL

North East 30 Avenue Drainage Improvements
Results
Less than $141,856 est. value
Lighthouse Point, FL

Canal Bank Repair
Results
Less than $650,000 est. value
North Lauderdale, FL

Sunrise Lakes Drive North Drainage Improvements
Results
Sunrise, FL

Last Updated 01/08/2019 01:48 PM
Project Title

N-29A Canal Connector Project

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction of a 72-inch culvert connecting the CBWCD’s N-29A canal to the N-22 canal with activities such as excavation within public right of way; minor dredging on both canals for their respective headwalls, minor grading, sidewalk and asphalt restoration, and an offset to an existing City of Sunrise utilities 10-inch water main SITE OF WORK: The site of the WORK is located in the Town of Davie, Florida, at the intersection of S Flamingo Rd and SW 14th St., in Sections 11 & 14, Township 50 South, and Range 4 East.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents