Similar Projects
Barbara W. Smith Family Life Center Steam Lab
Renovation - 50,000 SF
Bidding
$70,000 CJ est. value
South Holland, IL 60473

Bell ES - Gym Floor Replacement
Renovation
Sub-Bidding
$177,000 CJ est. value
Chicago, IL 60618

Hanson Park ES - Gym Floor Replacement
Renovation
Sub-Bidding
$95,455 CJ est. value
Chicago, IL 60639

Terrazzo Floor Refinishing at Oakwood School
Alteration
Post-Bid
$200,000 est. value
Lemont, IL 60439

27th Floor RJDC Project
Alteration
Post-Bid
$900,000 est. value
Chicago, IL 60602

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Highcrest Middle School Flooring
Alteration
Results
$200,000 est. value
Wilmette, IL 60091

Flooring Improvements at the Village of Schiller Park Public Library
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Schiller Park, IL 60176

Kinzie Floor Tile Installation
Alteration
Post-Bid
$30,000 est. value
Chicago, IL

Gymnasium Floor
Alteration
Results
$100,000 est. value
Chicago, IL 60632

Bell ES - 3rd Floor Carpet Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Chicago, IL 60618

2022 Wood Floor refinishing work at Palatine, William Fremd, James B. Conant, Schaumburg, and Hoffman Estates High Schools
Alteration
Post-Bid
$200,000 est. value
Palatine, IL

Mae Jemison Elementary School Gym Floor Replacement
Alteration
Results
$60,000 est. value
Hazel Crest, IL 60429

Water and Electric Building A Structural Floor Replacement
Renovation
Post-Bid
$60,000 CJ est. value
Winnetka, IL 60093

Kennedy High School Gym Floor
Alteration
Results
$200,000 est. value
Chicago, IL 60638

Last Updated 09/28/2023 09:34 AM
Project Title

Installation of an Epoxy Floor System at Fire Station 3

Physical Address View project details and contacts
City, State (County) Bedford Park, IL 60638   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 28, 2023, project was not awarded. No definite date for the rebid. The Village of Bedford Park, requests bids to establish a contract for the removal, prep, and installation of an epoxy floor system at Fire Station 3 located at 6799 W. Scope of work includes: o Remove, clean, and reinstall existing trench grates for the duration of epoxy work as required. o Perform all floor grinding of existing quartz flooring as required for suitable adhesion. o Patch all cracks and imperfections. o Furnish and install an epoxy primer layer as required. o Furnish and install a double layer of Sika Quartz FX epoxy body coat as required. o Furnish and install all new sealer coating as required. o Furnish and install all new urethane topcoat as required. o Furnish and install all new refinished cove bases and replace existing damaged cove bases as required. o Installation based on working all areas simultaneously. o Caulk all functional expansion joints with elastomeric sealant, basically all joints between apparatus bay and adjacent side rooms. o Reinstall 2 stripes, Color: Safety Yellow o Dust prevention to be done by Contractor. o Compliance with all Village rules, regulations, and prevailing wage provisions. The Village of Bedford Park reserves the right in receiving these proposals to waive technicalities and to reject any and all proposals.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents