Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Dunbar Creek Flood Protection Project
Post-Bid
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Frame, Park Grate
Post-Bid
Philadelphia, PA 19107

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

South 6th Street Floodplain Restoration Project
Post-Bid
Lewisburg, PA 17837

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

FY 2019 CDBG Storm Drainage Improvements along Kelly Avenue
Post-Bid
Folsom, PA 19033

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Furnish and Install a Precast Reinforced Concrete Box Culvert and Associated Items on Elm Street in Arnot
Post-Bid
Arnot, PA 16911

Reconstruction of Mckinley Street Wall
Results
Export, PA

Laurel Lake Road
Post-Bid
Columbia Cross Roads, PA 16914

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Besley Road
Post-Bid
Columbia Cross Roads, PA 16914

Hughesville Streambank Protection Project
Results
Hughesville, PA 17737

Reported 05/25/2021 12:00 AM
Project Title

3rd Level Road Pipe Replacement

Physical Address View project details and contacts
City, State (County) West Decatur, PA 16878   (Clearfield County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work include the following:1. Cut a 4-foot open trench across 3rd Level Road, along Krebs Highway (S.R. 0153) and remove the existing 6” PERF. SLCPP BASE DRAIN2. Replace the 6” PERF.SLCPP BASE DRAIN WITH 8” PERF. SLCPP BASE DRAIN.3. Upon replacing the 6” PERF. SLCPP BASE DRAIN with the 8” PERF.SLCPP BASE DRAIN, install No. 2B Crushed Sandstone over the pipe.4. Construct sediment/stilling basin with R-4 riprap.5. Re-grade the existing swales to provide proper drainage and line with R-4 riprap.6. Restore bituminous pavement and install super pave to match the existing depth of asphalt on Krebs Highway (S. R. 0153).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents