Similar Projects
WTP #5
New Construction
Design
$12,228,914 est. value
Buckeye, AZ

WTF #9
New Construction
Design
$6,190,000 est. value
Buckeye, AZ

Dove Valley Water Line
Infrastructure
Bidding
$2,500,000 est. value
Scottsdale, AZ 85268

Deer Valley Water Treatment Plant Finished Water Pump Station and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk Services
Renovation
Bidding
$30,000,000 est. value
Phoenix, AZ

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Neely WRP Facility Rehabilitation
Results
Gilbert, AZ 85233

Construction Manager at Risk Farallon Water Campus 16
New Construction
Bidding
$40,000,000 est. value
Buckeye, AZ

Public Housing Pipe Lining
Post-Bid
Chandler, AZ 85225

Water Treatment Services and Maintenance
Results
Gilbert, AZ 85295

Small Water Meter Installation, Repair and Consulting Services
Post-Bid
Chandler, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Water/Wastewater Pumps (Sales, Service and Repairs)
Term Contract
Post-Bid
Mesa, AZ 85210

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 10/22/2021 01:31 PM
Project Title

Arrowhead Water Production Facility Rehabilitation and Pecos Surface Water Treatment Plant Surge System

Physical Address View project details and contacts
City, State (County) Chandler, AZ 85224   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,542,935
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the Arrowhead Water Production Facility and approximately 2,400 feet of waterline replacement, and the installation of a surge tank at the Pecos Surface Water Treatment Plant. Work must be completed within 365 consecutive calendar days from the Notice to Proceed.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents