Similar Projects
Roadway Minor Rehab - SR 46
Infrastructure
Design
$838,000 CJ est. value
Niles, OH 44446

Roadway Minor Rehab - SR 46
Infrastructure
Design
$838,000 CJ est. value
Niles, OH 44446

Grinder Pump System Sanitary & Water Services
Infrastructure
Bidding
$400,000 CJ est. value
Warren, OH 44481

Dollar General #25417 / Weathersfield Township
New Construction, Infrastructure - 10,675 SF
Bidding
$1,000,000 CJ est. value
Niles, OH 44446

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Chip Seal - D04-CHIP FY2022
Infrastructure
Results
$1,225,000 est. value

Four Lane Resurfacing - TRU-SR 5-08.30
Infrastructure
Results
$3,035,000 est. value
OH

Slope Stabilization
Infrastructure
Construction
$26,000 CJ est. value
Masury, OH 44438

Mosquito Lake State Park Marina Fuel System Trumbull
Infrastructure
Construction
$392,125 CJ est. value
Cortland, OH 44410

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

Roadway Minor Rehab - US 62
Infrastructure
Design
$4,250,000 CJ est. value
Cortland, OH 44410

Construction of 23KV 4.16kv GE Substation Upgrade
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Niles, OH 44446

Chippewa Creek Flood Reduction Near Echo Lane Project
Infrastructure
Post-Bid
$9,051,740 CJ est. value
Warren, OH 44481

Last Updated 07/07/2023 12:19 PM
Project Title

Trumbull Energy Center

Physical Address View project details and contacts
City, State (County) North Jackson, OH 44481   (Trumbull County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Office, Paving/Reconstruction, Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a natural gas-fired power plant. As of July 7 2023, construction is underway.

Details

,, 53,000 SF - 40,000 SF. 13,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents