Similar Projects
2021 Stormwater and Street Improvements
Bidding
McFarland, WI

2021 Road Maintenance
Bidding
$280,000 to $340,000 est. value
Middleton, WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road Work
Bidding
Verona, WI

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Chip Seal
Bidding
WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

Crack Routing and Sealing
Results
Madison, WI 53703

New Glarus - Verona, South County Line - Gehin Street
Bidding
New Glarus, Verona, WI

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

Last Updated 11/16/2020 05:15 AM
Project Title

I-39 - Columbus, North Street to School Street

Physical Address View project details and contacts
City, State (County) Columbus, WI 53925 (Columbia, Dane Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 73; 7.420 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Beam Guard, and Pavement Marking. Consist of Removing Asphaltic Surface Milling, HMA Pavement, Base Aggregate Dense, Barrier System Grading, MGS Guardrail, Permanent Pavement Marking, Rumble Strips. Excavation Common, 28 CY; Backfill Granular, 128 Ton; Base Aggregate Dense, 11,069 Ton; Construction Staking, 39,183 LF; Construction Staking, 2 Each; Construction Staking, 1 LS; Culvert Pipe Reinforced Concrete, 4 LF 24“; Concrete Curb and Gutter, 17 LF; Concrete Sidewalk, 72 SF; Beam Guard, 2,875 LF; Beam Guard Energy Absorbing Terminals, 12 Each; HMA Pavement, 32,153 Ton; Removing Asphaltic Surface Milling, 138,870 SY; Tack Coat, 19,829 Gals; Marking Line Grooved Wet Ref Epoxy 4-Inch, 75,333 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents