Similar Projects
Jefferson Park Firehouse Apartments
Renovation
Conception
$2,400,000 est. value
Chicago, IL 60630

Woodfield Area Apartments
New Construction, Addition
Conception
$90,000,000 est. value
Schaumburg, IL 60168

400 Lake Shore Development
New Construction
Design
$1,000,000,000 est. value
Chicago, IL 60601

725 W Randolph Mixed Use
New Construction
Design
Chicago, IL 60601

Cassidy Place Mixed Use
New Construction
Post-Bid
$139,000,000 est. value
Chicago, IL 60654

CHA Patrick Sullivan Apartments
Renovation
Post-Bid
Chicago, IL 60612

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2021 Improvements at Fierke and Kruse Education Centers
Renovation
Results
Oak Forest, Orland Park, IL 60452

North Side Apartment & Office Building
New Construction, Build-Out - 27,500 SF
Construction
Chicago, IL 60654

43 Green Development
New Construction - 5,500 SF
Construction
$35,000,000 est. value
Chicago, IL 60653

Washington Boulevard Apartments
New Construction
Pending Verification
Oak Park, IL

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

North Union Mixed Use Phase III
New Construction - 323,370 SF
Conception
$10,000,000 CJ est. value
Chicago, IL 60610

North Union Mixed Use Master Plan
New Construction - 533,645 SF
Design
$1,300,000,000 est. value
Chicago, IL 60632

DMDF Vertical Expansion Project Front Ends
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Chicago, IL 60604

Last Updated 07/05/2023 02:33 PM
Project Title

Woods School Redevelopment

Physical Address View project details and contacts
City, State (County) Chicago, IL 60636   (Cook County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Medical, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Medical Office/Outpatient, Middle/Senior High School, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes but is not limited to, the following: the construction of a 48-unit multi-residential development; 22,000-square-foot medical facility; clubhouse / community center; and educational facility. This project is scheduled to go before the Chicago Zoning Board on June 30, 2023. Although there is not a firm timeline, construction could begin in first quarter 2024, 18- month completion. commencing construction.

Details

Parking Spaces, 80 Parking Spaces. 22,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Furniture, Seating, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents