Similar Projects
Plumbing Supplies
Bidding
Round Rock, TX 78681

Plumbing Systems Maintenance, Equipment, Parts and Services
Bidding
Seguin, TX 78155

Harbor Fountain Liner
Post-Bid
Rockwall, TX

Electronic Plumbing Control System at The Juvenile Justice Detention Center
Post-Bid
Houston, TX

Telford Unit: Replace Hot Water and Steam Piping
Results
New Boston, TX 75570

Electrical, Plumbing and Spray on Insulation for a Three Bedroom Apartment
Results
De Leon, TX 76444

Citywide Plumbing Services
Term Contract
Bidding
Dallas, TX

Plumbing Services - New Weight Room
Post-Bid
Kemp, TX 75143

Plumbing Maintenance and Repair Services
Results
Decatur, Euless, Fort Worth, Glen Rose, Gordon, Jacksboro, Keene, Mineral Wells, Saginaw, Stephenville, TX 76115

2020 MEP Project
Post-Bid
$9,000,000 est. value
Spring, TX 77379

Plumbing Services
Term Contract
Results
Less than $100,000 est. value
Port Arthur, TX

Master Plumber for an Existing Pre-Engineered Metal Building
Post-Bid
Waelder, TX 78959

Police Administration Sanitary Piping Repairs
Results
Less than $245,000 est. value
Brownsville, TX 78520

Plumbing Services
Term Contract
Post-Bid
Sherman, TX 75092

Plumbing Systems Maintenance, Equipment, Parts and Services
Term Contract
Results
Seguin, TX

Last Updated 02/18/2021 12:36 PM
Project Title

Y1DZ--549-SL-Clinic2Plumbing

Physical Address View project details and contacts
City, State (County) Dallas, TX 75216   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, supervision, materials, equipment, to remove, relocate and install new drain lines in confined space below slab in the interstitial space between slab and protective ceiling slab for electrical switchgear below. The scope includes capping all penetrations and one floor drain and two vent line after removal. The work includes rough-in for seven sink drains. Contractor to field verify condition of drain lines prior to and upon completion of work. This is a turn key project.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents