Similar Projects
Indian Tree Golf Club Improvements
New Construction, Renovation, Addition
Design
Westminster, CO 80005

2022 Citywide Concrete Panel Replacement
Infrastructure
Bidding
$1,100,000 to $1,300,000 est. value
CO

Big Springs Drive Sidewalk and Parking Improvements
Infrastructure
Bidding
Nederland, CO 80466

Peaks to Plains: Clear Creek Canyon Trail Phase 2
Post-Bid
CO

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Z--BLCA 208769 Road & Parking Lot Striping
Results
Montrose, CO

Region 1 Up-Grade ADA Curb Ramp at Varies Locations
Results
$1,000,000 to $5,000,000 est. value
CO

Citywide ADA Ramp and Concrete Repair Phase 2
Infrastructure
Bidding
$2,500,000 to $3,050,000 est. value
Denver, CO

Cooper Place Extension
Post-Bid
Pueblo, CO 81001

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

Cheyenne Arapaho Park Construction
New Construction
Bidding
Englewood, CO 80113

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

Design Services for Coffman Street Busway
Results
Longmont, CO

C20-050 Federal Boulevard Sidewalk Improvements
Infrastructure
Bidding
CO

Concrete Replacement Program
Post-Bid
Thornton, CO

Last Updated 01/26/2022 10:14 AM
Project Title

US 36 Bikeway Extension

Physical Address View project details and contacts
City, State (County) Superior, CO   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The first segment is on the south side of US 36, beginning of at the existing bike overpass passing beneath the 88th St bridge and connecting to east side of 88thSt. The second segment is at the east side of Rock Creek Parkway between 88th St. and Honey Creek Lane. The third segment is located at Autrey Park. The bikeway will be concrete.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents