Similar Projects
Booster Station Improvements and SCADA Project
Post-Bid
Hidalgo, TX 78557

Grigsby Lift Station Rehabilitation Project
Post-Bid
Port Neches, TX 77651

Cullen Regional Lift Station Rehabilitation
Results
Less than $768,600 est. value
Pearland, TX

Ratcliff Lake Lift Station Repairs
Results
$25,000 to $100,000 est. value
Ratcliff, TX

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

CDBG Lift Station Rehabilitation
Post-Bid
Poteet, TX 78065

Sewer Lift Station
Term Contract
Results
Less than $637,000 est. value
Harlingen, TX 78552

Village Creek Water Reclamation Facility South Flow Lift Station
New Construction
Construction
$19,993,000 est. value
Fort Worth, TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Booster Pump Replacement
Results

Ralston Creek Lift Station Elevation
Post-Bid
$375,000 est. value
Brenham, TX

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Last Updated 04/05/2022 11:34 AM
Project Title

Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Rising Star, TX   (Eastland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $85,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to the Owner’s existing high service pump station. Improvements include yard piping, valves, water line connections, replacement of two pumps, and incidentals.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents