Similar Projects
River Ring Towers
New Construction - 133,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Brooklyn, NY 11249

Kingsboro Psychiatric Center Redevelopment
New Construction, Demolition
Conception
Brooklyn, NY

BowTie Development aka 589 Fulton Street Skyscraper
New Construction - 502,356 SF
Design
$100,000,000 est. value
Brooklyn, NY 11201

Java Street Residences
New Construction - 611,502 SF
Design
$10,000,000 CJ est. value
Brooklyn, NY 11222

RFP D/B - Replacement of the Coney Island Abutment Wall and Saint Marks Bridge
Demolition, New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
New York, NY 11216

Coney Island 1B Elevator Rehabilitation (EV Package)
Renovation
Post-Bid
Brooklyn, NY 11224

Coney Island 1B Elevator Rehabilitation
Renovation
Post-Bid
Brooklyn, NY 11224

Mainline Track Replacement
Infrastructure
Results
$131,719,500 CJ est. value
New York, NY 11366

Empire Fulton Ferry and Dumbo Waterfront Project
Infrastructure
Results
$2,306,500 CJ est. value
New York, NY 11201

Alloy Block Downtown
New Construction - 30,000 SF
Construction
$240,000,000 est. value
Brooklyn, NY 11217

Jefferson Avenue Apartment Building
New Construction - 9,240 SF
Construction
Brooklyn, NY 11237

960 Franklin Avenue Towers Mixed use
New Construction - 2,738,628 SF
Pending Verification
$10,000,000 CJ est. value
Brooklyn, NY 11225

33 Franklin Mixed Use
New Construction - 95,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Brooklyn, NY 11222

Baltic Street Apartments
New Construction - 16,490 SF
Conception
Brooklyn, NY 11217

Fourth Avenue Mixed-use Building
Demolition, New Construction, Infrastructure - 6,312 SF
Design
$2,000,000 CJ est. value
Brooklyn, NY 11217

Last Updated 10/20/2022 03:43 PM
Project Title

Garden Street Multi-Residential Development

Physical Address View project details and contacts
City, State (County) Brooklyn, NY 11206   (Kings County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 20, 2022, a building permit was issued on September 26, 2022. The plan exam was approved by the New York City Building Department on April 13, 2022. Construction is expected to start soon if it has not already. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

9 Stories Above Grade, Remodeling, Remodeling.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents