Similar Projects
Retaining Wall Replacement and Fence Project along Yellowbird Road
Bidding
Less than $290,000 est. value
Portland, ME 04102

Talbot School Basketball Court Reconstruction and Culvert Replacement Project
Renovation, Infrastructure
Bidding
Portland, ME

Culvert Pipe
Post-Bid
Portland, ME

West Street Culvert Replacement
Results
Freeport, ME 04032

Willard Beach Storm Drain Outfall Replacement
Results
South Portland, ME

Supply and Delivery of a Precast Concrete Box Culvert
Results
Gorham, ME 04038

Riverton Culvert Rehabilitation Project
Results
Less than $1,045,000 est. value
Portland, ME

Large Culvert Replacement
Results
Gorham, ME 04308

Emergency Vehicle Ramps - Forest Avenue Overpass Mile 50.0 and Culvert and Drainage Repairs Mile 53.7
Results
Less than $750,000 est. value
Portland, ME

Woods Road Culvert Rehabilitation
Results
Falmouth, ME

Two Bartlett Brook Stream Crossing Upgrades
Results
Naples, ME

Large Culvert Replacement
Results
Less than $426,000 est. value
Cumberland, ME 04021

Large Culvert Replacement
Results
Less than $645,000 est. value
Bridgton, ME 04009

Underwood Road Drainage System Improvements
Results
Less than $500,000 est. value
Falmouth, ME

Back Cove West Storage Conduit
Results
Portland, ME

Last Updated 05/18/2021 10:39 AM
Project Title

Lantern Lane Culvert Replacement Project

Physical Address View project details and contacts
City, State (County) Windham, ME 04062   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Windham, in conjunction with Portland Water District (PWD), is requesting sealed bids for the Lantern Lane Culvert Replacement project. There will be two (2) separate contracts for this work: Contract (1) Culvert Replacement Town funded work and Contract (2) Water Improvements PWD funded work. The project consists of replacing the existing 36” CMP culvert crossing Lantern Lane with a new 48” Kanaflex culvert, associated cast-in-place concrete headwall/wingwalls, and water main renewal.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents