Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Moscow North and Moscow Alt Route
Infrastructure
Results

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

Last Updated 03/14/2023 02:31 AM
Project Title

Redfish Lake Phase 3 Road Improvement Project Sawtooth National Forest

Physical Address View project details and contacts
City, State (County) Stanley, ID 83278   (Custer County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Requisition/purchase Request No - 1082296 Solicitation Posting Presolicitation Notice GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest DESCRIPTION OF WORK Project Description: Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex. Work will occur at three primary locations as follows: Entrance Area ~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail. Roundabout Area ~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation. Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage. North Shore Area ~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 28-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway. ~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services. Reconstruct the North Shore Day Use Area including site amenities. Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state. Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required. Project Location: From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214. This represents the point of beginning of the Entrance Area. From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area. From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area. From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area. Contract Time: The work anticipated under any contract resulting from this solicitation anticipated start date for administrative and construction preparation tasks- June 5, 2023 August 14, 2023 - anticipated start date for on-the-ground construction. The Project End Date will be October 31, 2024 The magnitude of proposed project is between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents