Similar Projects
Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Dayton Waste Water Treatment Plant Improvements - Phase II
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dayton, WY 82836

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Wolf Creek Road Reconstruction Project
Infrastructure
Post-Bid
$240,000 est. value
Ranchester, WY 82839

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Guardrail and Miscellaneous Work
Infrastructure
Results
WY

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Results
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Pending Verification
$25,400,000 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Pending Verification
$25,400,000 CJ est. value
Sheridan, WY 82801

RFP D/B - Sheridan City Landfill Commercial Building, Design/Build Project
New Construction
Post-Bid
$440,000 est. value
Sheridan, WY

Chip Sealing and Miscellaneous Work
Infrastructure
Results

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

2022 Pavement Maintenance
Infrastructure
Post-Bid
$270,000 est. value
Sheridan, WY

Byron Streets (US 14A)
Infrastructure
Results
Sheridan, WY

Last Updated 11/02/2022 04:32 PM
Project Title

Wrench Ranch Master Plan Phase 1

Physical Address View project details and contacts
City, State (County) Sheridan, WY 82801   (Sheridan County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Retail, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of vehicle storage, construction equipment sales and operations as well as construction office and sales space at 910, 1010, 1015, 1080, 1085 Remington Road and 2810 Real Bird Way. Scope details have not been released. As of November 1, 2022 the project is in planning stage and seeking a recommendation of master plan revision from the City of Sheridan Planning Commission. A meeting was held October 24, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the summer of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents