Similar Projects
Essentia Health Clinic
New Construction - 6,000 SF
Conception
$3,300,000 est. value
Lisbon, ND

Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Theodore Roosevelt Presidential Library
New Construction, Infrastructure
Design
$80,000,000 CJ est. value
Medora, ND 58645

Broadway Circle Affordable Housing
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Minot, ND 58701

TMBCI - Comprehensive Outpatient Rehab Facility
New Construction, Infrastructure - 10,000 SF
Sub-Bidding
$3,000,000 CJ est. value
Belcourt, ND 58316

Career Impact Academy / Grand Forks
New Construction, Infrastructure - 56,900 SF
Post-Bid
$28,000,000 CJ est. value
Grand Forks, ND 58201

Osgood Golf Course Slope Stability Improvements
Infrastructure
Post-Bid
$440,000 est. value
Fargo, ND 58104

The Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Southern Embankment Reach 2A
Infrastructure
Results
$6,110,756 CJ est. value
Fargo, ND 58102

Grafton Athletics - Track and Field
Infrastructure
Results
$1,887,800 CJ est. value
Grafton, ND 58237

Pipestem Dam Spillway Modifications
Renovation, Infrastructure
Construction
$131,496,937 CJ est. value
Jamestown, ND 58401

Turtle Lake Ambulance Office/Shop
New Construction - 4,800 SF
Construction
$600,000 est. value
Turtle Lake, ND 58575

Lashkowitz Riverfront Apartments
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$33,900,000 CJ est. value
Fargo, ND 58103

International Peace Gardens - Campus Upgrades
Infrastructure
Pending Verification
$500,000 CJ est. value
Dunseith, ND 58329

NW Transmission - 12" along 30th Street and CR10A - City of Minot
Infrastructure
Conception
$2,245,400 CJ est. value
Minot, ND 58701

The Stockyard
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
West Fargo, ND 58078

Last Updated 06/22/2023 12:03 PM
Project Title

Comprehensive Outpatient Rehabilitation Facility

Physical Address View project details and contacts
City, State (County) Belcourt, ND 58316   (Rolette County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $5,800,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of new construction of a 10,000 SF C.O.R.F Facility for the Turtle Mountain Band of Chippewa Indians in Belcourt, ND.

Details

10,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents