Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain and Surface I-35
Infrastructure
Design
$20,000,000 CJ est. value
Pauls Valley, OK 73075

Pedestrian Improvements (Sidewalks) - City Street (North Missouri Street)
Infrastructure
Bidding
$141,756 CJ est. value
Elmore City, OK 73433

Pedestrian Improvements (Sidewalks) - City Street (North Missouri Street)
Infrastructure
Bidding
$141,756 CJ est. value
Elmore City, OK 73433

AMI-AMR Water and Electric Meters
Infrastructure
Post-Bid
Lindsay, OK

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Grade, Drain and Surface
Results
Pauls Valley, OK

Resurface (Asphalt)
Results
Lindsay, OK

Resurface (Asphalt)
Infrastructure
Results
OK

Sidewalk - Glenn Curlee Park - Installation
Infrastructure
Results
Lindsay, OK 73052

ADA Curb Cuts
Infrastructure
Results
Lindsay, OK

Pedestrian Improvements Sidewalks SH-19
Infrastructure
Results
OK

Joint Seal / Repair -I-35/US-177/SH-29/SH-31/SH-131
Infrastructure
Results

Slabjacking and Subsealing Services
Infrastructure
Results

Last Updated 08/09/2022 03:09 PM
Project Title

Elmore City - Pernell Public Schools Elementary School Improvements

Physical Address View project details and contacts
City, State (County) Elmore City, OK 73433   (Garvin County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of existing and the construction of a new parking area, basketball court, and site drainage improvements. For bids over $50,000, bidders will be required to provide bid security in the form of a Bid Bond, Cashiers Check, or Letter of Credit in the amount of five (5) percent of the bid amount. Successful bidders will be required to provide payment, performance and defect bonds for bids over $50,000. The Owner reserves the right to accept or reject any or all offers.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents