Similar Projects
16th Street Southwest - Minot City
Infrastructure
Conception
$1,700,000 est. value
Minot, ND 58701

NW Transmission - 12" along 30th Street and CR10A - City of Minot
Infrastructure
Conception
$2,245,400 CJ est. value
Minot, ND 58701

Broadway Circle Affordable Housing
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Minot, ND 58701

The Tracks
New Construction, Infrastructure - 53,277 SF
Design
$200,000,000 CJ est. value
Minot, ND 58701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Traffic Signal District
Infrastructure
Bidding
$500,000 CJ est. value
Minot, ND 58701

2022 Exploratory Drilling AML
Term Contract, Infrastructure
Post-Bid

RFQ D/B - Consolidated Helo/TRF/OPS AMU & Alert Facility
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Minot AFB, ND 58704

Advanced Metering Infrastructure
Infrastructure
Results
$1,032,671 est. value

Construction of the North Broadway Water System Improvements Project
Infrastructure
Results
$923,000 est. value
Minot, ND

Landfill Transfer Station Construction - 4580 - City of Minot
New Construction, Infrastructure
Construction
$4,200,000 CJ est. value
Minot, ND 58701

Broadway Watermain Upsizing 36th Avenue NW to 19th Avenue - W-2 - City of Minot
Infrastructure
Construction
$988,885 CJ est. value
Minot, ND 58701

3rd Street East and Central Avenue Reconstruction - E-13 - City of Minot
Infrastructure
Conception
$11,760,000 CJ est. value
Minot, ND 58703

Phase RC-1: Mouse River Park Bridge - City of Minot
Infrastructure
Design
$1,225,000 CJ est. value
Minot, ND 58701

Crack Seal, Seal Coat, Micro Surfacing, & Fog Seal
Infrastructure
Bidding
$400,000 CJ est. value
Minot, ND 58701

Last Updated 03/17/2023 07:42 AM
Project Title

Water, Sewer, and Street Improvement District No. 2022-1

Physical Address View project details and contacts
City, State (County) Berthold, ND 58718   (Ward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,666,882 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer (Gravity), Water Utilities, ADA Curb Ramps, Paving (Asphalt or Concrete). This project includes sewer and water improvements. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents