Similar Projects
Rainbow Valley Final Planned Area Development
New Construction
Conception
$2,000,000,000 est. value
Goodyear, AZ 85338

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Conception
$150,000,000 CJ est. value
Goodyear, AZ 85338

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Gentry on The Green
New Construction, Demolition - 156,000 SF
Design
$375,000,000 est. value
Scottsdale, AZ 85251

RFP - Development of P83 Central Business District
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Peoria, AZ 85345

Cerro Vista
New Construction - 2,094 SF
Post-Bid
Avondale, AZ 85018

Cerro Vista
New Construction - 2,094 SF
Post-Bid
Avondale, AZ 85018

Avondale Aquatic Center CMAR
Infrastructure
Results
Avondale, AZ

Pine Towers Phase III Design-Build
New Construction
Results
$5,042,756 est. value
Phoenix, AZ 85018

Apache Rock Apartments f/k/a Daybreak Apartments
New Construction - 75,193 SF
Construction
$3,500,000 est. value
Tempe, AZ 85281

Palm Tower
New Construction - 79,190 SF
Construction
$8,352,485 est. value
Phoenix, AZ 85004

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

The Paisley
New Construction - 24,696 SF
Pending Verification
Phoenix, AZ

Hawes Crossing - Master Plan
New Construction
Conception
Mesa, AZ 85212

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Last Updated 02/02/2023 10:13 AM
Project Title

Navona Apartment Homes / Avalon - Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85212   (Maricopa County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Misc. Recreational, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 400 unit apartment complex across 13 buildings. As of February 2, 2023, this project is seeking approval from the Mesa Planning and Zoning Board. An architect has been selected. Construction documents are underway. The developer is also the general contractor. A firm timeline has not been confirmed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents