Similar Projects
Dover Community Center
Addition, Demolition, New Construction, Infrastructure, Renovation - 20,000 SF
Bidding
$17,500,000 CJ est. value
Dover, MA 02030

Pump Station Improvements
Renovation
Post-Bid
$600,000 est. value
Westwood, MA 02090

Wastewater Pump Station Capital Improvements - General Bids
Renovation
Post-Bid
$1,500,000 est. value
Stoughton, MA

Construction Firm for the Purposes of Upgrades to Two Existing Sewer Ejector Stations
New Construction
Results
$300,000 est. value
Franklin, MA

Union Park Pump Station, Unmanned Pump Stations and Combined Sewer Overflow Detention and Treatment Facility
New Construction
Results
$4,389,533 est. value
Boston, MA

D'Angelis Water Treatment Plant PFAS Upgrades - General Bids
New Construction, Infrastructure
Post-Bid
$5,000,000 est. value
Millis, MA

South Stoughton Sewer Expansion, Pump Station
Infrastructure
Results
$900,000 est. value
Stoughton, MA

Hill Street Booster Pump Station
Infrastructure
Post-Bid
$1,700,000 est. value
Foxborough, MA 02035

Lake Drive Pump Station Replacement
Renovation
Results
$600,000 est. value
Needham, MA 02492

Braintree-Weymouth Pump Station Improvements - Filed Sub Bids
Renovation
Post-Bid
$9,950,000 est. value
Quincy, MA 02170

Braintree-Weymouth Pump Station Improvements - General Bid
Renovation
Results
$13,473,075 CJ est. value
Quincy, MA 02169

Security Improvements
Renovation
Post-Bid
$600,000 CJ est. value
Dedham, MA 02026

College Road Pump Station Improvements Project
Renovation
Results
$350,000 est. value
Wellesley, MA 02482

Tri-Town Regional Water Treatment Plant - Sub Bid
New Construction, Infrastructure
Post-Bid
$20,467,410 CJ est. value
Braintree, MA 02184

Potter Drive Wastewater Pump Station Generator Replacement - GC Bid
Infrastructure
Results
$162,647 CJ est. value
Bellingham, MA 02019

Last Updated 04/04/2023 12:03 AM
Project Title

Beaver Street Interceptor Rehabilitation / Replacement and New Beaver Street Pump Station

Physical Address View project details and contacts
City, State (County) Franklin, MA 02038   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $26,777,262 [brand] Estimate
Plans Available from Agency's Affiliate - 12/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to: 1. Installation of approximately 8,000 linear feet of 8-inch to 24-inch sanitary sewer by open-cut excavation and/or jack and bore 2. Rehabilitation of approximately 6,000 linear feet of 16-inch to 24-inch sanitary sewer using cured-in-place pipe lining 3. Installation of approximately 4,000 linear feet of 18-inch sanitary sewer force main by open-cut excavation and construction of associated sanitary sewer pump station 4. Installation of approximately 900 linear feet of new water main. 5. Associated work, including new manholes, manhole rehabilitation, trench and roadway pavement, traffic controls, and utility abandonment and relocation. Time of commencement of the Work and Contract Times for completion shall be in accordance with Article 4 of the Agreement and Section 01 13 13 Milestones Prospective Bidders obtaining Bidding Documents from the website will be registered as plan holders. The designated website will be updated periodically with addenda, lists of registered plan holders, reports and other information relevant to submitting a Bid for the Project. All official notification, addenda, and other Bidding Documents will be offered only through the designated website to registered plan holders. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Project is to be funded in part by the Massachusetts Clean Water Trust (the Trust). This project is subject to the following requirements: 1. All Law and Regulations under M.G.L. c. 30, 39M 2. A Bid Security in the amount of 5% included with the Bid Proposal. 3. The Department of Environmental Project ("DEP") has developed the Diesel Retrofit Program in response to increasing public health concerns with emissions from diesel engines and vehicles. All project proponents must comply with the DEP's Diesel Retrofit Program. Bidders must sign and submit the attached STATEMENT OF INTENT TO COMPLY with their bid. Each Contractor and its Subcontractor (s) must sign and email the attached DIESEL RETROFIT PROGRAM CONTRACTOR CERTIFICATION form to the DEP DMS project engineer, within 10 days after the contractor is awarded. 4. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the contraction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBE's. The two low bidders shall submit completed DBE forms (EEO-DEP-190C, EEO-DEP-191C and the DBE Certification of United States Citizenship form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non-responsive. No waiver of any provision of this section will be granted unless approved by the Department of Environmental Protection (MassDEP). 5. Minimum Wage Rates as determined by the Execute Office of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 top 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed work under this contract. Federal Minimum Wage Rates as determined by the United States Department of Labor under the DavisBacon Act also apply to this project. All inquiries regarding this IFB shall be directed to the Town's Procurement Officer: Pam Vickery Town of Franklin Purchasing Department 355 East Central Street, Room 206 Franklin, MA 02038 Phone: 508-553-4918 Fax: 508-541-5253 E-Mail: pvickery@franklinma.gov Biddershallsubmit all questions about the meaning or intent of the Bidding Documentsto Owner in writing or via email. Contact information and submittal procedures for such questions are as follows: Pam Vickery, Franklin Purchasing Department, 355 East Central Street, Room 206, Franklin, MA 02038; Phone: 508-553-4918; E-Mail: pvickery@franklinma.gov The subject heading for the email shall be: Franklin, MA BSI Rehabilitation/Replacement and New Beaver Street Pump Station - Bidding Documents Question Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven calendar days prior to the date for opening of Bids may not be answered U N S P S C Code: 72-14-00 Heavy construction services Awarded company US Modular Group, Inc

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents