Similar Projects
I-19-4491 - EWO 9 - ATP 10 - I-294 Bridge Reconstruction I-55 Ramp A
New Construction
Bidding
Downers Grove, IL

RR-18-4382 - EWO 2 Offsetting CO 6 - ATP 4 - I-294 Bridge Reconstruction
New Construction
Bidding
Downers Grove, IL

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Ceratech Fast-Setting Cement
Post-Bid
Lisle, IL

Entire Concrete Bridge Deck, Top of Sidewalks, Inside and Top of Parapets. Drai Age System Repairs and Cleaning
Results

Salt Creek Greenway Trail Pedestrian Bridge Steel Repair
Results
Wood Dale, IL 60191

I-19-4491 - CO 4 - ATP 3.1 - I-294 Bridge Reconstruction I-55 Ramp A
New Construction
Bidding
Downers Grove, IL

I-20-4722 Bridge Construction O`Hare To Westbound Il Rt 390 Ramp
Post-Bid
Less than $10,000,000 est. value
Downers Grove, IL 60515

Rozanne Drive at Westwood Creek Bridge Replacement
Results
Less than $858,546 est. value
Addison, IL 60101

I-19-4464 - CO 18 - ATP 40 - I-57 Roadway and Bridge Widening
New Construction
Bidding
Downers Grove, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

I-18-4352 Windsor Drive Bridge Replacement
Results
Less than $10,000,000 est. value
Oak Brook, IL 60523

I-19-4458 - CO 5 - ATP 7 - I-294 Bridge Widening and Reconstruction
New Construction
Bidding
Downers Grove, IL

I-19-4475 I-57 Widening over CSX and B OCT Railroad Bridge and I-57 Restriping
Post-Bid
Downers Grove, IL

Mallard North Service Bridge Repair
Results
Wheaton, IL 60189

Last Updated 07/08/2021 09:21 AM
Project Title

Bridge Deck Repair

Physical Address View project details and contacts
City, State (County) Wheaton, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $321,547
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various Bridge Deck Repairs Including Bridge Deck Patching, Hma/Waterproofing Membrane Replacement, And Miscellaneous Repairs To The Topside Of s.n. 022-0068 St. Charles Road Over Eb Dupage River. Pay Items Include Hma Sc Il-9.5 d n70 - 75 Ton; Conc Rem - 5.1 Cy; Conc Sup-Str - 5.7 Cy; Waterprf Membrane Sys - 467 Sy; Temp Conc Barrier - 675 Ft; Approach Sl Rep (Pd) - 30 Sy; Hma Surface Rm (Deck) - 451 Sy; Deck Slab Rep (Fd-t1) - 2 Sy; Deck Slab Rep (Fd-t2) - 2 Sy; Deck Slab Rep (Part) - 104 Sy.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents