Similar Projects
CID Highway 181 Eastern Shore Center Roadway Improvements
Infrastructure
Bidding
Spanish Fort, AL 36527

2021 Resurfacing Project
Post-Bid
Bay Minette, Daphne, Robertsdale, Spanish Fort, AL 36527

2021 Resurfacing Project Group B
Post-Bid
Elberta, Loxley, Robertsdale, AL 36551

Southern Region Disaster Recovery Support BPA
Results

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Asphalt Repair Eastbay Apartments
Infrastructure
Post-Bid
Daphne, AL

Farmer`s Market Roadway Paving Project
Results
$50,000 to $75,000 est. value
Foley, AL

Asphalt Resurfacing Project 2021
Infrastructure
Post-Bid
Loxley, AL

Resurfacing Projects 2021 Group 1
Results
Bay Minette, AL 36507

Provision of Labor and Equipment for Asphalt Placement
Infrastructure
Post-Bid
AL

Constructing the Planing, Resurfacing, and Traffic Stripe
Results
$1,476,709 to $1,804,866 est. value
Orange Beach, Perdido, AL 36561

Orange Beach Elementary School Resurfacing Project
Infrastructure
Post-Bid
Orange Beach, AL 36561

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-180 from a Point near the Fort Morgan Historical Site (Mp 0.000) to the Junction of SR-59 in Gulf Shores
Results
$2,197,622 to $2,685,982 est. value
Gulf Shores, AL

Streets and Drainage 2021
Infrastructure
Post-Bid
Foley, AL 36536

Fort Morgan Improvements
Results
Gulf Shores, AL

Last Updated 04/26/2022 03:03 AM
Project Title

North Drive (Rock Creek) Roadway Improvement Project

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project entails the base and road repair of approximately 505 SY of North Drive in the Rock Creek Community of Fairhope, Alabama. This roadway has suffered settlement due to deleterious materials contained within and saturation of the subbase and base. The work includes, but is not limited to the removal of asphalt, excavation of base and subbase material, placement of GeoGrid, new subbase and aggregate base, installation of perforated underdrain, curb repair and paving. This response should include all material, equipment, labor and incidentals to deliver a “turnkey” Public Works Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents