Similar Projects
Employee Parking Garage - Shelby County
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Memphis, TN 38103

Holmes Road - Shelby County
Infrastructure
Conception
$2,400,000 CJ est. value
Memphis, TN 38103

The Registry at Thornwood Phase 7
New Construction, Infrastructure - 128,000 SF
Design
$18,000,000 CJ est. value
Germantown, TN 38138

Piperton Historic House Renovation
Infrastructure, Renovation
Design
$250,000 CJ est. value
Piperton, TN 38017

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Asphalt Mix & Thermoplastic Markings
Alteration
Post-Bid
Germantown, TN

FY 2021 Asphalt Paving, North Section
Results
Memphis, TN 38103

FY 2021 Asphalt Paving, South Section
Results
Memphis, TN 38103

Glasgow PUD - Phase 1
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Germantown, TN 38139

Greyhound Station Redevelopment Project
Demolition, New Construction, Infrastructure - 34,000 SF
Pending Verification
$40,700,000 CJ est. value
Memphis, TN 38105

Shelby Farms Operations Center - Shelby County
New Construction, Infrastructure
Conception
$815,000 CJ est. value
Memphis, TN 38103

The Congregation
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Germantown, TN 38138

Hot Mix Asphalt
Infrastructure
Post-Bid
Memphis, TN

Hickory Hill Service Center Re-Paving
Results
Memphis, TN 38115

Poplar Oaks PD Hotel
New Construction, Infrastructure
Pending Verification
$19,310,000 CJ est. value
Germantown, TN 38138

Last Updated 12/05/2022 02:56 AM
Project Title

Benjestown Pedestrian Bridge - Shelby County

Physical Address View project details and contacts
City, State (County) Memphis, TN 38127   (Shelby County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Benjestown Pedestrian Bridge A detail scope cannot be determined. As of December 05, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents