Similar Projects
Storm Sewer Inlet Cleaning at NRL/DC
Results
Washington, DC 20375

Mcmillan Backwash Discharge to Sewer
Results
$5,000,000 to $10,000,000 est. value
Washington, DC 20016

Hamlin & Hickey Design Build - Low-Impact Development (Lid) Stormwater Retrofits
Results
Washington, DC 20001

Stormwater Management Maintenance Services
Post-Bid
Washington, DC 20009

Green Infrastructure (GI) Drainage and Stormwater Improvements Construction
Post-Bid
Washington, DC 20009

Green Infrastructure Maintenance
Post-Bid
Washington, DC 20032

Existing Storm Water Management System at the Potomac JCC
Post-Bid
$500,000 to $1,000,000 est. value
Washington, DC

FY21 Riversmart Schools Low Impact Development
Post-Bid
Washington, DC 20002

Last Updated 11/14/2019 02:13 PM
Project Title

GSA 11 Replace Damaged Sewer Drain Piping at Ronald Reagan Building

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The USAID has recently had restroom renovations, and grout waste has inadvertently clogged some riser stacks in the Ronald Reagan Building. The clogged riser pipe has resulted to several floods. Building O&M has investigated one of the risers (Room 3.07J) by cutting the 4" pipe and found the pipe filled with solid grout. The RRB was occupied in 1998 and houses a variety of tenants. The purpose of this Statement of Work (SOW) is to procure the services of a Construction Contractor to provide the Government with the repair of clogged sewer pipe risers located at the Ronald Reagan Building (RRB). The scope consists of replacing pipe, cleaning, pipe jetting, snaking, videoing and other means to clean and remove grout from pipes in stacks X.07 (West side) and X.08 (East side) at the janitors closets and men's rooms; floors 7 down to mezzanine level. Drywall removal and replacement is required at wall and ceiling in janitor's closets. Removal and replacement of water filters and copper water piping is required in west janitor's closets to make space for drain line removal and replacement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents