Similar Projects
Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

Pavement Overlay and Construction of Sedimentation Ponds for County Road 170
Infrastructure
Design
$200,000 CJ est. value
Evergreen, CO 80439

Golden Gate Canyon SP - Vault Toilet Replacement (Phase 2)
Demolition, New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Golden, CO 80403

Ward TOD Streets/ Intersections
Infrastructure
Bidding
$700,000 CJ est. value
Wheat Ridge, CO 80033

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

World-Wide Water Storage Tank Remediation
Term Contract
Results

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs
Results

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Rainbow Hill Road Hotel and Commercial
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Evergreen, CO 80439

Evergreen Lake North Trail Project
Infrastructure
Design
$400,000 CJ est. value
Evergreen, CO 80439

RFP D/B - Progressive Design-build for Van Bibber Trail and Crossings
Infrastructure
Bidding
$500,000 CJ est. value
Arvada, CO 80403

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Water Treatment Process Tank and Apparatus Repair
Results
Less than $300,000 est. value
Arvada, CO

Last Updated 08/18/2022 04:32 PM
Project Title

Underground Fuel Line Upgrade or Replacement

Physical Address View project details and contacts
City, State (County) Broomfield, CO 80021   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

underground fuel line repair or replacement as described in the solicitation documents. Buyers Requirements Award Requirements - All or None Award Question Acceptance Deadline 04/20/2022 06:00 PM EDT Questions are submitted online No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents