Similar Projects
300 West 900 North to 1600 North Waterline Replacement
Infrastructure
Bidding
Spanish Fork, UT

River Bottom Improvement Project Prequalification
Post-Bid

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 2000 South Utility
Results
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

200 South Water Main Improvements
Results
$3,000,000 to $3,400,000 est. value
American Fork, UT 84003

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021
Infrastructure
Post-Bid
Spanish Fork, UT

36" Culinary Water Line Replacement Project Segment 2
Results
Less than $10,051,493 est. value
American Fork, UT 84003

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

Mill Ditch Project
Results
Less than $1,665,895 est. value
Pleasant Grove, UT 84062

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

2020 Waterline
Results
$1,700,000 to $1,900,000 est. value
Orem, UT

1100 North Street and Waterline Project
Infrastructure
Post-Bid
Pleasant Grove, UT 84062

2020 2000 South PRV Project
Results
Orem, UT 84058

Last Updated 02/07/2022 10:27 AM
Project Title

36" Culinary Water Line Project Segment 3

Physical Address View project details and contacts
City, State (County) American Fork, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,926,385
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Work to be accomplished under this proposed Contract includes the following: Installing 5,767 feet of 36-inch DIP in American Fork City streets, beginning at 300 West and 200 South, running east to 200 East, and running north to 30 South. Work includes installing new culinary service connections and fire hydrants within the Project area. Existing culinary water lines must be reconnected to new 36-inch DIP. Also, included is the reconnecting and looping of existing utilities including irrigation, sewer, storm drain, and gas. Work to be performed includes valves, fittings, meters, excavation, backfilling, curb and gutter, road restoration and asphalt repaving. The Work features boring underneath a box culvert on 200 South, which will require steel casing and carrier pipe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents