Similar Projects
Isaac Agree Downtown Synagogue
Renovation
Conception
$4,500,000 est. value
Detroit, MI 48226

Community Center at Alfred Brush Ford Park
New Construction - 8,116 SF
Bidding
Detroit, MI 48215

Design and Build Aquatic Play Area
Post-Bid
Southgate, MI 48195

City of Melvindale Playground Design and Build Out
Post-Bid
Melvindale, MI 48122

Freshman Baseball Renovation 2020
Results
Northville, MI

Reconstruction of the Running Track at Woodhaven High School
Results
Brownstown, MI 48134

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Playground Equipment Relocations
Post-Bid
Westland, MI 48185

Playground Renovations
Results
Livonia, MI

Park Drinking Fountains
Post-Bid
Taylor, MI

Anderson High School 2020 Stadium Turf Replacement Project
Results
Southgate, MI 48195

Cobb and Lions Park Playgrounds - Design and Installation
Post-Bid
Southgate, MI 48195

Johnson Creek-Fish Hatchery Park Habitat Restoration Project
Results
Northville, MI

2021 Tennis Court Reconstruction and Baseball Improvement
Post-Bid
Northville, MI 48168

Town Square Park Project
Results
Livonia, MI

Last Updated 10/05/2021 04:42 PM
Project Title

Heritage Park Church Restoration

Physical Address View project details and contacts
City, State (County) Taylor, MI   (Wayne County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Park/Playground, Religious Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Park/Playground, Renovation, Religious Facility, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents