Similar Projects
Rakks Shelving Company Renovation
Renovation - 35,000 SF
Conception
Westborough, MA 01581

Lackey Dam Road Warehouse
New Construction - 646,000 SF
Conception
$10,000,000 CJ est. value
Douglas, MA 01516

NEADS Puppy Nursery
New Construction - 7,128 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Princeton, MA 01541

Blackstone Logistics Center
New Construction - 605,000 SF
Design
Less than $47,000,000 est. value
Uxbridge, MA

DCAMM Facilities Maintenance Building - General Bid
Renovation - 11,450 SF
Bidding
$4,546,000 est. value
Westborough, MA 01581

DCAMM Facilities Maintenance Building - General Bid
Renovation - 11,450 SF
Bidding
$4,546,000 est. value
Westborough, MA 01581

Spectrum Health Corporate Office and Patient Intake Buildings
New Construction - 47,000 SF
Sub-Bidding
Westborough, MA 01581

Rand Whitney Building
New Construction - 300,000 SF
Post-Bid
$10,000,000 CJ est. value
Boylston, MA 01505

Edward Jones
Renovation - 1,640 SF
Post-Bid
Sutton, MA 01590

Scheduled and Emergency Facility and Salt Shed Repairs at Various Locations
Results
Less than $240,700 est. value

Scheduled and Emergency Salt Storage Shed and Liquid Storage Tank Repairs at Various Locations (Including Martha's Vineyard)
Results
Less than $645,774 est. value

James Street Plaza
New Construction, Demolition - 77,265 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Worcester, MA

James Street Plaza
New Construction, Demolition - 77,265 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Worcester, MA

Imperial Hyundai Dealership Expansion
Addition - 2,356 SF
Pending Verification
Milford, MA

Industrial Drive Expansion
Addition - 8,175 SF
Pending Verification
Uxbridge, MA 01569

Reported 03/31/2022 09:50 AM
Project Title

225 West Street Office and Warehouse

Physical Address View project details and contacts
City, State (County) Milford, MA 01757   (Worcester County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method
Project Status Obtained from a Public Office, Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

,, 7,200 SF - Office, 1,200 SF New Construction, Warehouse/Storage, 2 Stories Above Grade, 6,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents