Similar Projects
Wastewater Treatment Facility Upgrades Phase I Project - General Bid
New Construction
Bidding
$33,600,000 est. value
Bridgewater, MA

Wastewater Treatment Plant Upgrades
Renovation
Bidding
$750,000 est. value
Easton, MA 02356

Wastewater Treatment Facility Upgrades Phase I Project - Filed Sub Bid
New Construction
Sub-Bidding
$33,600,000 est. value
Bridgewater, MA

Wastewater Treatment Facility Improvements - Sub-Bids
Renovation
Sub-Bidding
Less than $5,000,000 est. value
Adams, MA 01220

Wastewater Treatment Facility - Alum Flow Pacing Improvements
Post-Bid
Less than $50,000 est. value
Ayer, MA

Wastewater Effluent Launder Covers
Post-Bid
Marshfield, MA

Wastewater Treatment Facility Upgrades - Filed Sub-Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Downtown Area Wastewater Treatment Facility (WWTF) and Effluent Disposal - General Bid
Construction
$22,000,000 est. value
Orleans, MA 02653

West Stockbridge WWTP RBC Upgrades
Renovation
Bidding
$60,000 est. value
West Stockbridge, MA 01266

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

WWTF - Septage Receiving Upgrade
Results
Less than $1,250,000 est. value
Scituate, MA 02066

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - General Bid
Renovation
Bidding
$5,000,000 est. value
Acton, MA

Owner`s Project Manager Services for Martha's Vineyard Airport Waste Water Treatment Facility Upgrades
Post-Bid
West Tisbury, MA

Wastewater Treatment Facility Solids Handling and Septage System Upgrades - General Bid
Renovation
Results
$2,000,000 est. value
Edgartown, MA 02539

Reported 03/31/2022 12:00 AM
Project Title

Wastewater Treatment Facility Phase 2 Upgrades - General

Physical Address View project details and contacts
City, State (County) Hudson, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 03/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project is for upgrades to the Wastewater Treatment Facility and the Main Street Pump Station. The work for the project includes renovation and upgrade to the Control Building; Headworks Building repairs and improvements; replace Trickling Filter Clarifier mechanisms; Aeration System Upgrades; replace Activated Sludge Clarifier mechanisms; Process Building improvements; new generator installation; installation of slide gates within CCT; replace slide gates in CCT/Post Aeration Tank; miscellaneous yard structures and other improvements. The Main Street Pump Station upgrades include replacement and upgrades to its pumps, instrumentation, electrical components, new generator installation and other miscellaneous improvements. There are two bid alternates associated with this project. Bid Alternate 1 includes concrete tank coatings for the Trickling Filter Clarifiers, Activated Sludge Clarifiers, and CCT/Post Aeration Tank. Bid Alternate 2 is construction of a new detached garage to store the Town’s vactor-truck.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents