Similar Projects
Airfield Pavement Upgrades
Infrastructure
Bidding
$200,000 est. value
Poplarville, MS 39470

North Hangar Apron Reconstruction
Infrastructure
Bidding
$200,000 est. value
Columbus, MS 39701

Taxiway B Rehabilitation
Post-Bid
Greenville, MS 38703

UOX Runway 9-27 Pavement Rehabilitation
Post-Bid
Oxford, MS

Terminal Apron Sealcoat -Bruce Campbell Field
Results
Madison, MS

Carthage - Leake County Airport
Results
$1,000,000 to $2,999,999 est. value
Carthage, MS

Rehabilitate Taxiway Bravo, North of Charlie
Post-Bid
Meridian, MS

Asphaltic Overlay of Runway 1-19
Results
Meridian, MS

Rehabilitate Parallel Taxiways and Aprons
Post-Bid
Holly Springs, MS 38635

Runway and Taxiway Lighting, Windcone and Beacon Rehabilitation
Results
Prentiss, MS 39474

Rehabilitation of Taxiway Alpha Crossing at Runway 4-22
Infrastructure
Post-Bid
Meridian, MS 39307

Ramp Expansion - Waynesboro Municipal Airport
Results
$311,929 est. value
Waynesboro, MS 39367

Hawkins Air Field Medium Intensity Approach Lighting System (MALSR) with Runway Alignment Indicator Lights (Rail) Creek Crossing Replace
Term Contract
Post-Bid
Jackson, MS 39213

Runway Pavement, Runway and Taxiway Lighting and Beacon Rehabilitation
Results
Brookhaven, MS

Columbus-Lowndes County Airport Taxiway Pavement Rehabilitation
Infrastructure
Post-Bid
Columbus, MS 39701

Last Updated 05/20/2022 10:36 AM
Project Title

FY 2022 Airfield Improvements

Physical Address View project details and contacts
City, State (County) Columbus, MS 39701   (Lowndes County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will be that associated with four (4) individual projects. 1) North Hangar Apron Reconstruction which will involve the removal of existing concrete aprons followed by the construction of new asphalt aprons. Also included is the installation of new storm pipe as well as the removal of a 10,000 gallon underground storage tank; 2) South Apron LED Lighting which will involve the installation of 12 new LED light fixtures on the four existing overhead light poles. Also included is the installation of new electrical cables for the two north light poles; 3) Wildlife Fence Installation which will involve the modification of the existing 6-foot chain-link perimeter fence to 8-foot wildlife fence. Also included is the modification of two automatic/electric driveway gates; 4) Storm Drainage Rehabilitation which will involve the removal and replacement of an existing 36-inch storm pipe. Also included is the re-grading of the adjacent grassed area to repair erosion and smooth the drainage area.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents