Similar Projects
Partial Roof Replacements with Mechanical Upgrades
Alteration
Post-Bid
Blue Springs, Independence, Lees Summit, MO 64015

Partial Roof Replacements with Mechanical Upgrades
Alteration
Post-Bid
Blue Springs, MO 64015

Roof Replacement - Kansas City DOLIR Building
Alteration
Results
Kansas City, MO 64102

Roof Restoration for the Independence Police Department Headquarters Building
Alteration
Results
Independence, MO 64050

Fairmount Elementary School Roof Improvements
Alteration
Post-Bid
Independence, MO 64053

Central Garage Roof Replacement
Alteration
Results
Independence, MO 64052

Re-Roofing of Park Structures
Alteration
Post-Bid
MO

Roof Coating Projects
Alteration
Results
Grandview, MO 64030

2120 Amie - Roof, Gutters, Painting
Alteration
Post-Bid
$30,000 est. value
Kansas City, MO 64124

Operations And Reservoir Roof Replacements
Renovation, Alteration
Results
Sugar Creek, MO 64050

PVC Wind-Vented Roof System Installation
Renovation
Post-Bid
$145,219 CJ est. value
Kansas City, MO 64138

Hazel Grove Elementary School and Lee`s Summit West High School Roofing Replacements
Alteration
Results
$80,000 est. value
Lees Summit, MO 64064

Roofing Improvements - Penn Valley Advanced Technical Skills Institute
Renovation
Post-Bid
$700,000 CJ est. value
Kansas City, MO 64109

Partial Roof Replacements
Renovation
Post-Bid
$60,000 CJ est. value
Blue Springs, MO 64015

Roof Restoration and Replacement 2023 Summer Projects
Renovation
Post-Bid
$300,000 CJ est. value
Kansas City, MO 64106

Last Updated 03/06/2023 11:08 AM
Project Title

Roof Replacement - Northeast Middle School

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64124   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not necessarily limited to: Removal or repair of the existing deteriorated steel deck system. Replace with new steel deck to match existing. (Include 400 square foot of replacement steel deck system within Base Bid #1 scope of work.) All additional/deduction labor and material costs associated with deck replacement is to be under Unit Cost at space provided on Bid Proposal Form A. This section is for the convenience of the Contractor only and shall not be considered a complete account of all work to be performed. B. The extent of the Scope of Work is indicated on the drawings and as referenced in the specification sections. To further support the Boards Equity Policy of inclusion and diversity, KCPS has established annual goals for MBE and WBE. The annual goal for MBE should equal 9.8 percent of the applicable District spend. The annual goal for WBE should equal 8.5 percent of the applicable District spend. ALL QUESTIONS MUST BE SUBMITTED VIA E-MAIL BY February 28, 2023, 12:00 PM, CST. Any questions submitted after that date and time will not be considered or answered.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents