Similar Projects
NACA Wastewater Treatment Plant Improvements
Renovation
Bidding
$300,000 est. value
Bentonville, AR

SWU WWTF Phase 1 Improvements
Renovation
Bidding
$50,000,000 est. value
Springdale, AR

Heber Springs Water and Sewer – WWTP Improvements
New Construction
Post-Bid
$7,000,000 est. value
Heber Springs, AR 72543

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

North WWTP Levee Rehabilation
Renovation
Results
Atkins, AR

Architectural Services
Infrastructure
Results
McCrory, AR

Oxidation Ditch Aerator Gear Reducer
Renovation
Bidding
$200,000 est. value
Benton, AR

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Construction of the Proposed Wastewater Treatment Facility Improvements
Renovation
Results
$2,520,000 est. value
Flippin, AR

Earle Wastewater Treatment Improvements
Renovation
Bidding
$1,902,000 est. value
Earle, AR

Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Hazen WWTP UV Replacement
Renovation
Results
Hazen, AR

Lost Bridge Village Treatment Facilities Improvements
New Construction
Post-Bid
$2,000,000 est. value
Garfield, AR

Emerson Wastewater Treatment Project
Renovation
Results
Emerson, AR

Wastewater Rehabilitation Project
Renovation
Post-Bid
Heber Springs, AR

Reported 06/01/2022 10:33 AM
Project Title

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72206   (Pulaski County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists generally of the rehabilitation of modifications at the Fourche Creek Water Reclamation Facility, including the construction of a FOG receiving station, the replacement of the mixing systems in primary digesters nos. 5 and 6, and the construction of a new waste gas burner system.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents