Similar Projects
Z1DA--595-21-111 Replace Day Tanks Buildings 2/17 - Design Build
Term Contract
Design
$150,000 to $200,000 est. value
Lebanon, PA 17042

Sump Replacements at LNA Site # 69704
Renovation, Infrastructure
Bidding
Fort Washington, PA 19034

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Southern Operations and Maintenance Facilities Improvements
New Construction, Addition, Demolition - 118,144 SF
Construction
PA

Renzie #1 Potable Water Storage Tank Painting
Post-Bid
New Stanton, PA 15672

Bunker Hill Water Storage Tank
Results
Central City, PA 15926

Hempfield Potable Water Storage Tank Construction
Post-Bid
New Stanton, PA 15672

Underground Storage Tanks Modification - Victory, Courtland, Southern
Results
Philadelphia, PA

Tank Painting Mixer and Power Vent Installation
Post-Bid
Lower Burrell, PA 15068

WWTP SBR Valve Replacement
Results
$550,000 est. value
Waynesboro, PA 17268

Y1NE--529-14-101 Demolish Water Tower Design Build
Demolition
Post-Bid
$500,000 to $1,000,000 est. value
Meridian, PA 16001

Underground Storage Tank Closure at Bridge Valley Elementary School
Results
Furlong, PA 18925

Last Updated 09/01/2021 07:11 AM
Project Title

SCI Muncy - New Water Tower and Line for Municipal - General Construction

Physical Address View project details and contacts
City, State (County) Muncy, PA 17756   (Lycoming County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is located at SCI Muncy - Install a new waterline with interconnection to Montgomery Water Authority. Perform rehabilitation of filtration system components at water treatment plant. Construct a storage building addition at the water treatment plant. Do restoration work on the existing concrete water storage tank. 1. Complete all electric work for water treatment plant, storage building, and water storage tank. 2. Installation of RTUs at two well buildings and fiber optic cable connection with water treatment plant. The Goals for each Prime Contract is as follows: General Construction – ALL BASE BIDS (#1, #2 & #3) SDB = 6% VBE = 3%.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents