Similar Projects
The Oaks
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oklahoma City, OK 73131

North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

MAPS4 - Animal Shelter - (Ward 7) - City of Oklahoma City
New Construction, Infrastructure
Design
$29,162,700 CJ est. value
Oklahoma City, OK 73115

MAPS4 - Animal Shelter - (Ward 7) - City of Oklahoma City
New Construction, Infrastructure
Design
$29,162,700 CJ est. value
Oklahoma City, OK 73115

Touchmark at Coffee Creek - Memory Care Renovation / Edmond
Addition, Demolition, Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Edmond, OK 73003

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Interior Demolition and Site Clearance
Demolition, Infrastructure
Post-Bid
Oklahoma City, OK 73104

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Regional Design/Build General Construction Indefinite Delivery Indefinite Quantity (IDIQ)
New Construction
Results

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

New City Hall Building - City of Edmond
Demolition, New Construction, Infrastructure - 65,000 SF
Pending Verification
$32,600,000 CJ est. value
Edmond, OK 73034

Heritage Church of Christ
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Edmond, OK 73034

Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

Bridge Rehabilitation - US 40
Infrastructure
Design
$1,500,000 CJ est. value
Oklahoma City, OK 73145

Last Updated 06/29/2023 02:30 PM
Project Title

MAPS 4 - Family Justice Center - City Of Oklahoma

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73102   (Oklahoma County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2027
Bids Due View project details and contacts
Estimated Value $38,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

MAPS 4 will sustain the transformational effects of Palomar by building a new, permanent, $38 million facility for the family justice center that was first created by the Oklahoma City Police Department. Palomar assists victims of domestic violence, sexual assault, elder abuse, human trafficking, and supports children exposed to trauma. Palomar’s current facility is temporary. The larger, permanent facility would ensure that Palomar’s work continues and thrives. As of September 16, 2021, the Oklahoma City’s City Council approved the MAPS 4 Implementation Plan on September 14, 2021. MAPS 4 is not a bond program. It is a cash program. The schedule which determines the timing of each of the 16 areas of projects has not been developed. The owner is in the process of hiring professionals to help with that process. Bidding for designers, contractors has not been established. The program is an 8-year collection period therefore this project may not begin for eight years.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents