Similar Projects
Community Center Memorial Room AV and Stage Lighting Replacement Project
Infrastructure, Renovation
Design
$800,000 CJ est. value
Wheaton, IL 60189

Building Immersive Lab Lighting Controls - Phase 2
Renovation
Sub-Bidding
$100,000 CJ est. value
Glen Ellyn, IL 60137

Public Works Switch Replacement
Alteration
Post-Bid
Downers Grove, IL

Addison Trail HS Classroom Partition
Alteration
Post-Bid
Addison, IL 60101

Woodridge Greene-Valley WWTP and Knollwood WWTP
Alteration
Results
Burr Ridge, Woodridge, IL 60517

Annual Maintenance of Electrical Systems
Term Contract
Results

Electrical Wire and Cable
Alteration
Post-Bid
Downers Grove, IL

Edward Hospital Substation Transformer Replacement
Alteration
Results
Naperville, IL 60540

Indian Trail JHS Electrical Improvements
Alteration
Post-Bid
Addison, IL 60101

Systemwide Ramp Queue Detection
Alteration
Results
Downers Grove, IL

Jefferson Elementary School Mechanical and Electrical Equipment Pre-Purchase
Alteration
Post-Bid
Elmhurst, IL 60126

Well No. 5 Sodium Hypochlorite System
Demolition
Results
$144,000 est. value
Lisle, IL

Electrician Services
Alteration
Post-Bid
Naperville, IL

City Hall Technology Upgrade Electrical Services
Alteration
Results
Wheaton, IL 60187

E-Rate Low Voltage Structured Cabling Systems BP4D
Alteration
Post-Bid
Hinsdale, IL 60521

Last Updated 03/29/2023 08:35 AM
Project Title

ITS Device and Fiber Material Fabrication

Physical Address View project details and contacts
City, State (County) Oak Brk Mall, IL 60521   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $602,122 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes the fabrication, shipping, and storage of materials to be supplied to the installation contractors, including but are not limited to: electric cable; fiber optic cable; light poles; ITS disconnect switches; and all other appurtenant and miscellaneous work. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4526D.4873R_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on March 3, 2023. The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 32.5 and Mile Post 36.4 in Cook County, Illinois

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents