Similar Projects
Goraleigh Chiller
Bidding
Raleigh, NC

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Chiller and Air Handler
Results
Less than $33,739 est. value
Raleigh, NC

Bard Wall Mount Heat Pump - 3.5 Ton
Results
Less than $55,860 est. value
NC

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Bard Wall Mount Heat Pump - 3 Ton
Results
Less than $33,190 est. value
Raleigh, NC

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

Replace Chilled Water Coils
Results
Less than $130,347 est. value
Raleigh, NC 27601

DPS - Morrison Aggrey Dorm Heating System Replacement
Post-Bid
Raleigh, NC 27699

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Last Updated 07/16/2020 09:09 AM
Project Title

Security System Installation and Repair

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Security System Installation/Repair (JOC) - Contractor must carry appropriate licenses and/or certifications, including being licensed in NC by the NC Alarm Licensing Board. The contractor shall have a minimum of five (5) years experience and a permanent service facility within fifty (50) miles of the WCPSS Rock Quarry Rd. Complex. Hie contractor must be qualified and experienced to perform maintenance repairs and minor installation to existing building CCTV, Access Control, and/or Intrusion systems. The contractor must have adequate knowledge of system wiring, installation, and programming of these systems from multiple manufactures. The contractor must be able to respond on a 24 hour, 7day basis, and will be expected to respond to emergency requests within 2 hours.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents