Similar Projects
Trail Mountain Emergency Watershed Protection Project
Post-Bid
Castle Dale, UT 84513

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Parowan Pipe Lining with Centripipe Applied Liner
Results
$230,000 to $250,000 est. value
Parowan, UT

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Reported 05/27/2020 12:00 AM
Project Title

Construction of the 400 East Storm Drain Rehab Phase 1

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The bid includes the following: Slip-line approximately 690-feet of an existing 72-inch CMP storm drain pipe with 66-inch fiberglass pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents