Similar Projects
Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

Emerald Creek Site Condos
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Shelby Township, MI 48315

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

Boardwalk Decking Replacement Phase II
Infrastructure
Bidding
$177,495 CJ est. value
Harrison Township, MI 48045

Masonic Water Tower Rehabilitation
Infrastructure
Bidding
$392,000 CJ est. value
St Clair Shrs, MI 48082

AutoZone #3981 / Shelby Township
New Construction, Infrastructure - 7,000 SF
Sub-Bidding
$1,500,000 CJ est. value
Shelby Township, MI 48316

AutoZone #3981 / Shelby Township
New Construction, Infrastructure - 7,000 SF
Sub-Bidding
$1,500,000 CJ est. value
Shelby Township, MI 48316

McDonalds #2072: Mod C: Roseville
Renovation - 4,134 SF
Post-Bid
Roseville, MI 48066

Jollibee's Fast Food Restaurant
New Construction, Demolition - 2,493 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48313

Transportation Building Site Renovations Project
Infrastructure
Results
Warren, MI 48089

In-System Storage Devices
Infrastructure, Alteration
Results
Clinton Township, MI

Panera Bread #6190
Renovation - 3,458 SF
Construction
Warren, MI 48092

Bosco's Pizza Expansion
Addition
Construction
$3,000,000 est. value
Warren, MI 48091

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

Last Updated 12/19/2022 10:39 AM
Project Title

Jefferson Avenue Carry Out Additions

Physical Address View project details and contacts
City, State (County) St Clr Shores, MI 48080   (Macomb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Site plan was approved to the St Clair Planning commission November 21, 2022. Information regarding the selected architect or contractor has yet to be determined. A firm construction timeline has not been set, however construction is not expected to begin prior to mid to late 2023.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Office Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents