Similar Projects
Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 est. value
Orange, CA 92869

Katella Terrace
Demolition, New Construction, Infrastructure - 10,581 SF
Design
$30,000,000 CJ est. value
Orange, CA 92867

Construct a New Detention Basin
Infrastructure
Bidding
$4,170,000 CJ est. value
Placentia, CA 92870

Construct a New Detention Basin
Infrastructure
Bidding
$4,170,000 CJ est. value
Placentia, CA 92870

Beverly Neighborhood Street Rehabilitation
Alteration
Post-Bid
Orange, CA

Glen Mar Frontage Road Beautification Project
Infrastructure
Post-Bid
Huntington Beach, CA 92646

Turtle Rock Community Park Parking Lot Rehabilitation
Infrastructure
Results
$680,000 est. value
Irvine, CA 92606

Pavement Management Plan Project
Infrastructure
Results
$200,000 est. value
Laguna Woods, CA

The Madison
New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Santa Ana, CA 92705

The Madison
New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Santa Ana, CA 92705

Bristol Street (Bear Street to Santa Ana Avenue) Bicycle Facility - City of Costa Mesa
Infrastructure
Conception
$525,000 est. value
Costa Mesa, CA

Wilson Street Widening Design From College Avenue To Fairview Road - City of Costa Mesa
Infrastructure
Design
$15,375,000 est. value
Costa Mesa, CA

RFQ - Villa Park High School - Phase 2: New Classroom Building and Building 100/200 Modernization
Demolition, New Construction, Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Villa Park, CA 92861

Last Updated 09/20/2022 09:31 AM
Project Title

Alley No. 27, 45, and 86 Improvement FY 2020-21

Physical Address View project details and contacts
City, State (County) La Habra Heights, CA 90631   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $275,555 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises furnishing all materials, equipment, tools, labor and incidentals per the Plans, Specifications, and Contract Documents for the project. The general items consist of but not limited to Mobilization; Storm Water Best Management Practices (BMPs); Excavation and Disposal; Cold Mill; Construct and Compact Crushed Miscellaneous Base Material (CMB); Construct AC Pavement; Construct Header Board; Remove Existing and Construct PCC Alley Approach; Remove Existing and Construct Sidewalk; Remove Existing and Construct PCC Curb & Gutter; and all associated work as identified on the Plans, Specification, and Detail Construction Drawings in the City of La Habra The work to be constructed hereunder is located at Alley 27 (north of La Habra Boulevard bet. Orange Street and Cypress Street), Alley 45 (south of 1 st Avenue bet. Aldrich Street and Cypress Street), and Alley 86 (east of Euclid Street bet. 1 st Avenue and La Habra Boulevard) within City of La Habra, County of Orange. Typical work to be done is illustrated on plans and these specifications. The City has determined that a Class A General Contractor License is required for this project. Each bid must be accompanied by a certified cashiers check or by a corporate surety bond on the form furnished by the City, as guarantee that the bidder will, if an award is made to him in accordance with the terms of his bid, promptly secure Worker Compensation Insurance and Liability Insurance, execute the contract in the required form and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of materialmen and workers thereunder. Said check or bidders bond shall be in an amount of not less than ten (10) percent of the amount of the bid. The Faithful Performance Bond shall be not less than one hundred (100) percent of the total amount of the bid price named in the contract. The Payment Bond shall be not less than one hundred (100) percent of the total amount of the bid price named in the contract. The City reserves the right to reject any bond if, in the opinion of the Engineer, the Suretys acknowledgment is not in the form included in the contract documents or in another form substantially as prescribed by law Bidders may submit questions and/or clarification requests to James Valdez via email at jvaldez@lahabraca.gov or Tony An via email at tan@lahabraca.gov by 4:00PM on Tuesday, August 9, 2022 All work shall be completed within Forty-five (45) working days from the start date specified in the Notice To Proceed. The City reserves the right, after opening the bids, to reject any or all bids, waive any informality or irregularity in such bids, or to award to the lowest responsible bidder and reject all other bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents